Skip to main content

Argentina deal delayed

A project to construct much-needed highway links in Argentina now looks to have hit delays. The tender process for the highway projects, which will lie along the Atlantic coast of Buenos Aires Province, has now been held back. A partnership comprising IECSA, Chediack, Coarc, Equimac and Martinez de la Fuente had a proposal for the package of works disqualified due to financial terms of the various deals.
March 6, 2012 Read time: 2 mins
A project to construct much-needed highway links in Argentina now looks to have hit delays. The tender process for the highway projects, which will lie along the Atlantic coast of Buenos Aires Province, has now been held back. A partnership comprising 3649 IECSA, 3650 Chediack, Coarc, 3651 Equimac and 3653 Martinez de la Fuente had a proposal for the package of works disqualified due to financial terms of the various deals. However a consortium comprising 1382 Roggio, 1389 Esuco and 1383 Helport and 3648 Cartellone, 1399 Supercemento, 1401 Rovella Carranza and 1393 Eleprint has been able to meet the financial terms for the package of works. The authorities have structured the various contracts so that the winner of the package of works should have to achieve a minimum turnover through toll revenues and this is where the one consortium had proven unable to meet the necessary terms. It seems likely that a new financial grounding will be structured by the group comprising comprising IECSA, Chediack, Coarc, Equimac and Martinez de la Fuente in a bid to re-enter the tender process on equal terms against the group comprising Roggio, Esuco and Helport and Cartellone, Supercemento, 1401 Rovella Carranza and Eleprint.

For more information on companies in this article

Related Content

  • Costa Rica concrete repairs
    February 15, 2012
    Work has started on the long awaited San Jose-Caldera Highway in Costa Rica, following numerous delays and setbacks. The new 77.5km highway will be used daily by more than 81,000 vehicles, reducing the travel time between the Central Valley and the Central Pacific Coast by at least 30 minutes.
  • Plans now in place for new Uruguay-Argentina bridge
    July 22, 2014
    Plans are now in place for a new bridge that will link Uruguay and Argentina. The project will be carried out by Chinese contractor China Dalian International Cooperation Group (CDIG). The private agreement signed by CDIG will see the firm constructing a bridge connecting Colonia del Sacramento in Uruguay with Argentinian capital Buenos Aires. The work is expected to cost up to US$829 million to complete and when the bridge is open it will make a significant reduction in journey times from Montevideo and Bu
  • Legal tangle over Polish highway project
    February 29, 2012
    The complex legal tangle over Poland's troubled A2 highway project is continuing to develop.
  • Copy of New Midtown Tunnel open in Virginia
    January 30, 2017
    A project to construct the second Midtown Tunnel link in the US state of Virginia alongside the original connection has taken an important step forward – Mike Woof writes Commuters in the US state of Virginia will be pleased that the new Midtown Tunnel is now open to traffic, as it will help to boost capacity and cut congestion on the busy US 58 route connecting Norfolk and Portsmouth. The 1.13km tunnel link has been built to link with the interchange at Brambleton Avenue and Hampton Boulevard in Norfolk