Skip to main content

Argentina deal delayed

A project to construct much-needed highway links in Argentina now looks to have hit delays. The tender process for the highway projects, which will lie along the Atlantic coast of Buenos Aires Province, has now been held back. A partnership comprising IECSA, Chediack, Coarc, Equimac and Martinez de la Fuente had a proposal for the package of works disqualified due to financial terms of the various deals.
March 6, 2012 Read time: 2 mins
A project to construct much-needed highway links in Argentina now looks to have hit delays. The tender process for the highway projects, which will lie along the Atlantic coast of Buenos Aires Province, has now been held back. A partnership comprising 3649 IECSA, 3650 Chediack, Coarc, 3651 Equimac and 3653 Martinez de la Fuente had a proposal for the package of works disqualified due to financial terms of the various deals. However a consortium comprising 1382 Roggio, 1389 Esuco and 1383 Helport and 3648 Cartellone, 1399 Supercemento, 1401 Rovella Carranza and 1393 Eleprint has been able to meet the financial terms for the package of works. The authorities have structured the various contracts so that the winner of the package of works should have to achieve a minimum turnover through toll revenues and this is where the one consortium had proven unable to meet the necessary terms. It seems likely that a new financial grounding will be structured by the group comprising comprising IECSA, Chediack, Coarc, Equimac and Martinez de la Fuente in a bid to re-enter the tender process on equal terms against the group comprising Roggio, Esuco and Helport and Cartellone, Supercemento, 1401 Rovella Carranza and Eleprint.

For more information on companies in this article

Related Content

  • Chile-Argentina Agua Negra Tunnel progress
    February 16, 2018
    The names of the contractors offering bids for the new Agua Negra Tunnel project connecting Chile and Argentina will be revealed in March 2018. Several firms have already expressed a keen interest in this major engineering project. Contractors that have expressed interest include CRS, a consortium comprising China Railway Tunnel Group and Benito Roggio e Hijos. In addition, Ingenieria y Construccion Sigdo Koppers and OHL are also interested in the project as are the firms Rovella and Condotte. The project
  • Chile-Argentina tunnel project attracts interest
    March 12, 2018
    Interest is strong in the project to build a new tunnel connecting Argentina and Chile. In all 26 firms have entered into the bidding process, joining together to comprise 10 consortia. The project is likely to cost US$1.5 billion, with much of the necessary financing being supplied by the IADB. The consortia include: Astaldi, FCC and Rivas; CCCC and JCR; China Railway Construction and Panedile; Dragados, Techint and Besalco; OHL, Condotte and Rovella; Power China and Sacde; Sacyr Construccion, SK
  • Argentina tunnel project for Buenos Aires area
    January 13, 2017
    Plans in Argentina call for the construction of a major new road tunnel project. Called the Paseo del Bajo, the tunnel will provide an important connection between the existing Illia highway and the highway joining capital Buenos Aires with La Plata. The 6.7km tunnel is costing some US$650 million and intended to carry trucks and buses only, with light traffic remaining on existing surface routes. Removing heavy traffic from existing routes on the surface will help cut congestion, as well as delivering majo
  • Reunion Island coastal road delays continue
    January 21, 2021
    Delays continue to trouble the Reunion Island coastal road project.