Skip to main content

Advanced tolling for Rhode Island

CS America has successfully completed a fast track open road tolling (ORT) project which took just two and a half months to complete, from planning to lane opening, for Rhode Island Turnpike & Bridge Authority (RITBA). The lanes will help maintain traffic flow on this busy thoroughfare over Narragansett Bay, which is host to the 2012 America’s Cup World Series. The work included implementing the CS gantry FastFlow system with attached antennas, lasers, and cameras, as well as interfacing with the existing R
July 10, 2012 Read time: 2 mins
6166 CS America has successfully completed a fast track open road tolling (ORT) project which took just two and a half months to complete, from planning to lane opening, for 6167 Rhode Island Turnpike and Bridge Authority (RITBA). The lanes will help maintain traffic flow on this busy thoroughfare over Narragansett Bay, which is host to the 2012 America’s Cup World Series.

The work included implementing the CS gantry FastFlow system with attached antennas, lasers, and cameras, as well as interfacing with the existing RITBA field system. CS America was able to leverage its experience in similar projects throughout the US and worldwide. The project continues RITBA’s use of the E-ZPass system, while introducing new system features like licence plate image review which is vital to ORT systems.

“We are extremely pleased to offer our community faster travel in time for the summer activities of our tourist season,” said Buddy Croft, RITBA’s executive director. “Our tolling contractor, CS-America stepped up to an extremely tight timeframe and brought the project in on time and on budget, two things as a customer we place a high value on.”

For more information on companies in this article

Related Content

  • Fast and efficient asphalt paving for rural road rebuilds
    January 22, 2013
    The rural roads near Brandýs nad Labem, in the heart of the Czech Republic, may not be as heavily travelled as their counterparts in Prague, about 25km (15.5 miles) to the southwest, but they are nevertheless crucial pipelines to the rural and agricultural areas of the country. An assessment by regional authorities indicated that these roads are in need of repair. That led to cold planing and paving work on a series of rural roads near Brandýs nad Labem. Regional authorities have two key requirements: The r
  • State-of-the art road tunnels in construction and use of ITS
    April 25, 2013
    A wealth of major road tunnel construction projects and significant cant ITS installations within existing key road tunnels have been recently completed or will soon be underway. Guy Woodford examines some of them. A state-of-the art Tunnel Boring Machine (TBM) - the 10th largest ever to be built worldwide will be put to work later this year on New Zealand Transport Agency’s landmark Waterview Connection project in Auckland. The giant Herrenknecht-manufactured machine will be used to construct the twin 2.5
  • Transurban to test Melbourne drivers in road trials, including tolls
    June 23, 2015
    Melbourne’s road users are the focus of a year-long study into what options are possible for funding road infrastructure projects including various user-pays models. The study headed by Australian toll roads operator Transurban will conducted across Melbourne’s entire road network to see how drivers react to tolling and other road-use models such as charging motorists for each kilometre travelled, a charge to access roads, annual fixed costs per kilometre on expected usage and price per trip. It will al
  • River level monitoring to reduce scour risk
    July 11, 2022
    An OTT ecoLog 1000 water level logger with cellular data connection to Hydromet Cloud was trialled upon the Vales Burn Bridge in Scotland