Skip to main content

ADB to provide Tajikistan US$105 million for key road projects

Asian Development Bank (ADB) will provide Tajikistan US$105 million for two key highway projects. Around $82 million, including subsidies of $70 million, will be used to reconstruct the 88km long Vose - Khovaling road. A further $23 million will go on asphalting the Sayron - Karamyk road. On their completion, both highway works are expected to enhance regional economic cooperation and inclusive economic growth in Tajikistan.
August 12, 2013 Read time: 1 min
943 Asian Development Bank (ADB) will provide Tajikistan US$105 million for two key highway projects.

Around $82 million, including subsidies of $70 million, will be used to reconstruct the 88km long Vose - Khovaling road. A further $23 million will go on asphalting the Sayron - Karamyk road.

On their completion, both highway works are expected to enhance regional economic cooperation and inclusive economic growth in Tajikistan.

For more information on companies in this article

Related Content

  • ADB’s US$150mn loan will help pay for Azerbaijan’s Masally-Shorsulu highway
    February 11, 2014
    The Asian Development Bank (ADB) is set to transfer the US$ 150 million second tranche of a loan for construction of Masally-Shorsulu highway in Azerbaijan. The first $250 million ADB loan tranche has already been sent, with the overall project cost set to reach $625 million. Azerbaijan will get a $100 million third ADB loan tranche in 2016, taking the Bank’s total loan investment in the new highway to $500 million. Reconstruction of all Azerbaijan’s highways is set to cost at least US$38.2billion (AZN 29.
  • Central Asia’s need for improved transport infrastructure
    October 5, 2018
    Central Asia has a need for improved transport infrastructure to help develop economies - Gordon Feller reports
  • ADB’s US$95mn loan for key Kazakhstan highway
    July 9, 2012
    Asian Development Bank (ADB) will provide a loan worth US$95million to Kazakhstan for the reconstruction of the Western Europe - Western China highway. The 20-year loan will be given with a four-year grace period at interest rate of LIBOR+0.4% for each interest-paying period. The overall cost of the Western Europe-Western China highway project is US$ 112million.
  • ADB providing funding for Pakistan highway
    June 22, 2016
    Much of the funding for the completion work necessary for Pakistan’s M-4 Highway is being provided by the Asian Development Bank. This will come in the shape of a loan worth US$100 million. A further $34 million in funding is being provided through a grant from the Department for International Development (DFID) in the UK. The highway is of enormous economic importance for Pakistan and the region as it will boost trade and assist with political stabilisation of the region. The M-4Highway forms part of an