Skip to main content

Abu Dhabi setting out transport plan

Engineering firm EC Harris is now starting work on a two year contract for Abu Dhabi's transport plan.
February 29, 2012 Read time: 1 min
Engineering firm 3449 EC Harris is now starting work on a two year contract for Abu Dhabi's transport plan. The project was awarded by the Abu Dhabi Department of Transport and is for the country's Surface Transport Master Plan (STMP). This will form an integral part of Abu Dhabi's development of its transportation infrastructure.

The STMP consists of 37 main road projects, seven traffic management projects and 14 road safety projects valued at over US$25 billion that need to be developed and constructed by 2030.

EC Harris will provide Programme Management Services to support and advise the Department of Transport on which schemes should be constructed first, prioritised on the basis of value for money and need, and to oversee the phased implementation of the Master Plan over the next two years.  EC Harris will also advise on the creation, shape and form of the infrastructure company which will maintain all of the major assets created as a result of the Master Plan.

For more information on companies in this article

Related Content

  • Trail blazing for the Gordie Howe Bridge
    February 23, 2024
    Gordie Howe International Bridge between Canada and the US will become the first international bridge to link national trail systems across the border.
  • Taking the coast road on Reunion Island
    April 4, 2017
    An ambitious project on Reunion Island will improve transport
  • RMD formwork for Qatar’s tallest bridge on Doha East Corridor
    July 6, 2016
    RMD Kwikform will be supplying tens of thousands of tonnes of its formwork and shoring for construction of Qatar’s tallest bridge on the Doha East Corridor project As well as the bridge, the Corridor contract comprises four interchanges at a total cost of US$612.5 million. Ashghal, Qatar's Public Works Authority, awarded the Corridor project to China Harbour Engineering Design and Construction. Built as a five-lane 11km bypass in Doha, the capital of Qatar, the project will also cater for a rail line
  • Low temperature asphalt and aggregate options’
    February 7, 2014
    At what point does ‘some technology’ become ‘enough technology’? Less than four years ago industry publications were filled with a persistent message, the reluctance of UK based contractors to adopt machine control to the same extent as near European neighbours, particularly close ones such as Ireland and Holland. However from 2009 onwards we have seen a huge shift in demand for machine control as the success of high profile road and rail jobs such as the M25 widening scheme and Airdrie – Bathgate rail