Skip to main content

Key toll road project in Indonesia

Work on a 39km toll road linking Pemalang with Batang in Indonesia is expected to start in mid-2012, although the finance structure is still being established.
February 23, 2012 Read time: 1 min
Indonesia toll projects Work on a 39km toll road linking Pemalang with Batang in Indonesia is expected to start in mid-2012, although the finance structure is still being established.

Related Content

  • New road project commencing in Kenya
    August 7, 2019
    Work is due to start shortly on a new road project in Kenya that will boost transport between Kenol and Isiolo. The US$297.5 million project is for a dual carriageway connecting Kenol, Nyeri, Sagana and Isiolo. The road will measure around 163km in all and construction is expected to take three years to complete. Financing for the work is being provided jointly by the African Development Bank and the Kenyan Government.
  • Special mixes produced for a race track in Indonesia
    March 4, 2022
    International motorcycle racing has returned to Indonesia with help from asphalt plants supplied by Lintec & Linnhoff after a 24-year hiatus
  • Canada’s toll Highway 407 extension east of Toronto opens
    June 21, 2016
    A US$780 million eastward extension to Toronto’s major toll highway 407 has opened after four years of construction. Work on 407 East Phase 1 project – which also included construction of the smaller Highway 412 – involved building more than 148 lane-kilometres and 11 interchanges. The 22km road stretches from Brock Road in the town of Pickering to Harmony Road in the city of Oshawa. Highway 412 is a 10km north-south road that connects Highway 407 to Highway 401. Travel on the toll road will be free u
  • Australian highway project starting
    October 7, 2019
    Work is due to start on an important highway project in Australia’s Queensland State in mid-2020. The second phase of the improvement works for the M1 Pacific Motorway will cost an estimated US$528.3 million (A$749 million). Although the work is only for an 8km stretch, the project is costly as this wide section of the route carries heavy traffic, around 150,000 vehicles/day on average. The improvement project will add facilities for buses. A stretch of motorway will be widened to five lanes in one directio