Skip to main content

Key toll road project in Indonesia

Work on a 39km toll road linking Pemalang with Batang in Indonesia is expected to start in mid-2012, although the finance structure is still being established.
February 23, 2012 Read time: 1 min
Indonesia toll projects Work on a 39km toll road linking Pemalang with Batang in Indonesia is expected to start in mid-2012, although the finance structure is still being established.

Related Content

  • Indonesian toll road project construction
    April 18, 2022
    Construction has started for a key Indonesian toll road project.
  • Major new highways projects for Indonesia due
    November 11, 2015
    Work on Indonesia’s massive Trans Kalimantan road link will commence in 2016. The planned route stretches for some 7,600km and the project will be started by the Indonesian Government. The budget for the project is still unclear. The cost of the project was estimated in 2014 at US$496.74 million. More roads will be upgraded in 2016 because many of the country’s provincial and district roads will now feature national road status and will be managed by the central government. Another important project is for
  • Indonesia toll road projects face construction delays
    March 9, 2018
    The collapse of an elevated toll road section in Indonesia has triggered delays to ongoing projects for new links. A stretch of the Bekasi-Cawang-Kampung Melayu (Becakayu) toll road section in East Jakarta collapsed. As a result, work on a series of elevated highway projects has been halted. The projects are the Cimanggis-Cibitung toll road, Ciawi-Sukabumi toll road, Cibitung-Cilincing toll road, Jakarta toll road, Kayu Agung-Palembang-Betung toll road, Krian-Legundi-Bunder-Manyar toll road, Pasuruan-Probo
  • Multi-million dollar investment in Indonesian road toll projects
    July 12, 2012
    Millions of US dollars are being poured into new and expanding toll road projects in Indonesia. Wijaya Karya (Wika), the Indonesian government-owned construction service provider, will build toll roads linking Kedung Badak to Kedung Halang and Pandaan to Gempol in Bogor through two contracts worth US$36.35million (IDR 340.80bn) and US$23.98million (IDR 225bn), respectively. Awarded by highways operator Jasa Marga (JSMR), the contracts require the roads completion in 18 months.