Skip to main content

Key toll road project in Indonesia

Work on a 39km toll road linking Pemalang with Batang in Indonesia is expected to start in mid-2012, although the finance structure is still being established.
February 23, 2012 Read time: 1 min
Indonesia toll projects Work on a 39km toll road linking Pemalang with Batang in Indonesia is expected to start in mid-2012, although the finance structure is still being established.

Related Content

  • Five consortia line up for Denmark’s new Storstrøm Bridge project
    June 18, 2015
    The Danish government has shortlisted five consortia for construction of a new Storstrøm Bridge to replace an aging structure. The cost of the bridge connecting the Danish islands of Zealand and Falstser amounts to nearly €563 million (US$625.7 million) and the bridge will be financed by the government's Infrastructure Fund. Companies that qualified for the project are a joint venture consisting of Vinci Construction Grand ProjectsSAS, Hochtief Infrastructure GmbH and MT Højgaard; the consortium of St
  • India’s longest tolled expressway is open to traffic
    January 2, 2013
    Earlier this year, a new expressway was opened to traffic in India, adding connectivity to the country’s road network - Mike Woof reports. India’s economic growth has fuelled a massive construction boom in the country. Road building has been set as a priority by the Indian Government to help ensure continued economic development and improve connectivity between major population centres. One major new expressway has recently opened to traffic, having been designed to international standards and provides insi
  • Indonesia’s road network continues to grow
    April 24, 2014
    Indonesia’s road network is growing at a healthy pace, though further expansion is required to meet demand. At the end of 2013, the total length of Indonesia’s national road network was 38,750km. This marks a significant increase from the total of 34,628km recorded in 2004. Meanwhile the total length of the country’s road network has increased to from 373,523km in 2004, to 508,968km in 2013. Total toll road length in Indonesia has increased from 595km in 2004 to 784 km in 2013. A further 329km of toll roads
  • Moscow-Kazan highway project commencing in 2020
    November 25, 2019
    Construction work for the new highway route connecting Russia’s capital Moscow with the city of Kazan is planned to start in 2020.