Skip to main content

Key toll road project in Indonesia

Work on a 39km toll road linking Pemalang with Batang in Indonesia is expected to start in mid-2012, although the finance structure is still being established.
February 23, 2012 Read time: 1 min
Indonesia toll projects Work on a 39km toll road linking Pemalang with Batang in Indonesia is expected to start in mid-2012, although the finance structure is still being established.

Related Content

  • Indonesia working on financing of Tebing Tinggi-Kisaran toll road
    August 16, 2016
    Indonesia is looking to finalise the financing of the Tebing Tinggi-Kisaran toll road that is likely to cost around US$661 million. The 60km road is part of the trans-Sumatra highway project, which is targeted for completion in 2019, according to a report in the Jakarta Post newspaper. The route – one of 30 priority infrastructure projects - will connect Kuala Namu International Airport and Kuala Tanjung Port with the nearby Sei Mangkei industrial complex. “Of the eight priority routes on the trans-Sumat
  • Indonesian toll road project tender
    June 9, 2021
    A major Indonesian toll road project tender is opening.
  • Indonesia projects being planned
    January 10, 2018
    Financing is being sought in Indonesia for a series of major infrastructure projects. In all the work is expected to require US$9.59 billion and is for six highway projects, with one in Kalimantan and five in Java. The project in Kalimantan is for the Bontang-Samarinda Highway. In Java the highway projects are for links from Cileunyi-Tasikmalaya-Cilacap stretching 183km, Bawen-Yogyakarta, Kamal-Balaraja-Teluknaga stretching 48.3km, Semanan-Balaraja stretching 31.7km and Semarang-Demak.
  • New port, bridge and toll road links for Indonesia
    January 20, 2015
    In Indonesia investment in infrastructure will see the construction of a new bridge and toll roads in Banten Province during 2015. The work is intended to help with the development of the Merak Port, according to the Ministry of Public Works and Housing. The plan includes construction of a 3km toll road and a 600m bridge to connect to the port. Another project planned is for an 84km toll road. The Panimbang-Serang road will become part of the 5,000km nationwide toll road network and will provide a link to t