Skip to main content

Key toll road project in Indonesia

Work on a 39km toll road linking Pemalang with Batang in Indonesia is expected to start in mid-2012, although the finance structure is still being established.
February 23, 2012 Read time: 1 min
Indonesia toll projects Work on a 39km toll road linking Pemalang with Batang in Indonesia is expected to start in mid-2012, although the finance structure is still being established.

Related Content

  • Indonesia’s new tolled highway projects
    September 29, 2016
    A series of major infrastructure projects are now moving forward in Indonesia, with financing sources having been identified for the work. Key projects include a tolled highway for East Java and a new tolled road and bridge link in East Kalimantan. Work on the 158km South Coast road project for East Java is moving forward with the securing of financing in the shape of a US$225.8 million loan from the Islamic Development Bank (IDB). A tolled highway link is being planned between Melawai in Balikpapan city
  • Indonesia toll road tender bdding
    July 28, 2015
    Indonesia’s state-owned toll operator, Jasa Marge, is bidding for two major toll road projects. The toll road operating concessions are for the Balikpapan-Samarinda and Manado-Bitung routes. The 99m Balikpapan-Samarinda toll road will connect capital Jakarta with East Kalimantan province. By 2018, the 39km Manado-Bitung toll road will run between the western and eastern parts of North Sulawesi. Jasa Marga has also found the financing necessary to fund the Medan-Kuala Namu-Tebing Tinggi toll road in Deli
  • Indonesia toll road projects – deals being arranged
    October 26, 2018
    A series of major toll road projects are being planned for Indonesia.
  • Indonesia road funding found for two highways
    June 27, 2016
    Financing looks to have been secured for major tolled highway projects in Indonesia. These highways are the 129km Pekan Baru-Dumai route, which forms part of the Trans-Sumatra highway, the 60.5km Cileunyi-Sumedang-Dawuan (Cisumwadu) road and the 39km Manado-Bitung route. A loan from the Asian Infrastructure Investment Bank (AIIB) worth some US$370.2 million is expected to provide around half of the financing required for the Pekan Baru-Dumai route. Meanwhile loans worth a total of $300.2 million from the Ex