Skip to main content

Illuminated road studs deliver tidal flow safety

Cornwall's Saltash Tunnel on the A38 trunk road is a crucial link between the county, and the neighbouring county of Devon, and is used by 38,000 motorists per day. Opened in 1988, the 410m long road tunnel in south-west England, is a single bore with three traffic lanes, and is part of the tidal flow system across the three-lane Tamar Bridge. The central lane has a speed limit of 30mph (48km/hour) and operates as a reversible lane to cope with holiday and rush hour traffic.
May 2, 2012 Read time: 3 mins
3i Traffic's iiiLEVEL Smartstud IPT system has been installed in Cornwal's Saltash Tunnel
Cornwall's Saltash Tunnel on the A38 trunk road is a crucial link between the county, and the neighbouring county of Devon, and is used by 38,000 motorists per day.

Opened in 1988, the 410m long road tunnel in south-west England, is a single bore with three traffic lanes, and is part of the tidal flow system across the three-lane Tamar Bridge. The central lane has a speed limit of 30mph (48km/hour) and operates as a reversible lane to cope with holiday and rush hour traffic.

Both the tunnel and the bridge operate a combined tidal flow system in order to maximise traffic flow, delineated by illuminated red lane markings and supplemented by overhead control signs. A number of hard-wired LED road stud systems were used over the years for lane separation, but were prone to corrosion and found to be unreliable, suffering system failures and requiring constant maintenance.

To resolve the problem, the 1441 UK Highways Agency's and the Tamar Bridge and Torpoint Ferry Authority, opted to install 3i Innovations's IPT (Inductive Power Transfer) system.

A total of 714 bi-directional red Smartstuds illuminated red lane markings will be installed over 4km, including on the Tamar Bridge, previously not possible due to the 40mm thickness of the asphalt on the steel deck. The first stage of the project was completed in March, 2011 and the project is scheduled to be fully operational by July 2011. Lights are spaced at 3 and 6m intervals in multiple dimming and switching groups. Power supplies are relay control linked to the overhead VMS lane signals.

Inductive power transfer (IPT) is the technique that sees power coupled across an air (or other non-metallic material) gap by magnetic induction. Power is transferred without making direct contact with the cable, making it wireless. For traffic applications, the cable is sealed into the road and the light units are situated on the road surface above it; being wireless, the light units have greater tolerance than hardwired light units and can move without breaking the power connection. With no wired connections, there is no corrosion, meaning the system has a much longer life expectancy and is easier to maintain and install than traditional road stud systems, offering significant savings in maintenance costs.

Says Charles Maud, CEO of 3i Traffic: "Traffic authorities around the world are searching for more dynamic traffic management in order to reduce congestion and improve safety. It is a matter of fact that high contrast on-road warning lights do reduce the number of accidents; 3i solves all the historic hardwired electrical problems and we have an advanced understanding of managing long tern survival rates for on-road lights. We are the front runner in offering Traffic Authorities the most cost effective on-road lighting solution based on total cost ownership analysis"

For more information on companies in this article

Related Content

  • Highway 407 Revisited – smart tollroad extension
    June 7, 2016
    In the late 1990s, World Highways published a supplement on construction of Canada’s Highway 407, the world’s first all-electronic toll road. But how successful has it been? David Arminas reports from Toronto The head office for 407 ETR Concession Company is a low-rise building next to exit 59, just north of Toronto, Canada’s economic powerhouse. The building may be non-descript but inside is the advanced technical heart of Highway 407 ETR – Express Toll Route. It houses the latest toll monitoring techno
  • US$410mn ADB loan to build second Vietnam Southern Highway
    August 14, 2013
    The Asian Development Bank (ADB) is to lend US$410 million to Vietnam for the construction of the Second Southern Highway that links Ho Chi Minh City and the Mekong Delta. The arterial highway will consist of two cable-stayed bridges measuring a total of 5km, and 26km of interconnecting roads and associated access. The interconnecting roads and two bridges are expected to reduce the three-and-a-half hour travel time between Long Xuyen and Ho Chi Minh City by an hour, while the 90-minute travel time between
  • Safety: 'roads a major factor'
    July 23, 2012
    Road infrastructure has a core role to play in improving road safety and accident statistics often understate this. Marco Mongiello reports Everybody agrees that road safety is a very important issue. In 2006 in the European Union (EU 25) there were 38,400 casualties and 1,700,000 road injuries, with a total cost of E160 billion. For most people there are no doubts: the driver's behaviour is to blame. However, "road infrastructure has a core role to play in improving road safety and this has been recognised
  • Volvo machines help construct new Norwegian tunnels
    January 12, 2015
    Close to Larvik in Norway’s Vestfold County and around 80km south of Drammen, two tunnels are currently under construction as part of a state-funded infrastructure development programme. The project, which began earlier this year, comprises 7km of four lane highway – part of the E18 major route – linking the towns of Bommestad and Sky. This includes the new Larvik and Matineå tunnels, which will span 2.8 and 1.3km respectively. Worth €187 million, this project was awarded to Skanska Norway, the second la