Skip to main content

Highway developments in India

A major highway deal has been agreed for a road project in Gujarat, India, worth an estimated US$810.8 million. It will be handled under the build, finance, operate and transfer basis and will involve upgrading and widening to six lanes a 102km section of National Highway 8 (NH-8) from Ahmedabad-Vadodara. The project also includes upgrading 92km of the existing Ahmedabad-Vadodara expressway. Work is expected to take three years to complete, and the 25-year concession deal for the project has been agreed bet
February 23, 2012 Read time: 2 mins
A major highway deal has been agreed for a road project in Gujarat, India, worth an estimated US$810.8 million.

It will be handled under the build, finance, operate and transfer basis and will involve upgrading and widening to six lanes a 102km section of National Highway 8 (NH-8) from Ahmedabad-Vadodara.

The project also includes upgrading 92km of the existing Ahmedabad-Vadodara expressway.

Work is expected to take three years to complete, and the 25-year concession deal for the project has been agreed between IRB Ahmedabad Vadodara Super Express Tollway unit of 2700 IRB Infrastructure Developers and the 292 National Highways Authority of India (NHAI).

In another development, a joint venture is being established comprising 3063 Ennore Port, L&T Ship Building and 2701 Tamilnadu Industrial Development Corporation (TIDCO) for construction of a 25.5km road project to connect Kattupalli port and Ennore port in Chennai.

The road will be constructed on a build, operate and transfer basis at a cost expected to be around $81.5 million.

Related Content

  • Porner commissions another Biturox plant for India’s IOCL
    November 24, 2017
    Pörner Group recently handed over to India’s IOCL a Biturox plant that has the annual capacity to supply bitumen for more than 1,000km of road. Pörner and IOCL (Indian Oil Company Limited) commissioned the Biturox bitumen plant located at IOCL’s Barauni Refinery near Patna in eastern India. This is the 4th plant operated by IOCL based on Biturox technology. Pörner again provided the license and engineering services.
  • Peruvian toll road 'environmentally sound'
    February 23, 2012
    The International Road Federation's Global Road Achievement Awards (GRAA) programme is a competition to honour and recognise road-industry projects that demonstrate excellence and innovation in road development worldwide.
  • Algeria is investing in more highway infrastructure
    August 21, 2013
    Algeria’s Public Works Ministry has announced it plans to build new expressway connections to the country’s East-West highway. These expressways will link the Algeria’s ports to the East-West highway, with the aim of reducing congestion and improving traffic flow. A US$373 million expressway measuring 30km long will link the port of Skikda with the East-West highway, with construction work due to start in September 2013. Larger still, a 111km highway will be built linking Djendjen port to Algeria’s East-Wes
  • Work underway on new tunnel and highways in Vietnam
    May 22, 2013
    Work is now underway in Vietnam on a new tunnel and two new highway projects. The US$81 million tunnel project is being carried out under the build-operate-transfer model and lies close to the existing Hai Van tunnel, with completion due in 18 months. Construction work for the upgrade of National Highway 1A is costing some $105 million and should be complete within 24 months. The largest of the three projects however is the 140km Dan Nang-Quang Ngai Expressway, which is costing close to $1.34 billion to con