Skip to main content

Highway developments in India

A major highway deal has been agreed for a road project in Gujarat, India, worth an estimated US$810.8 million. It will be handled under the build, finance, operate and transfer basis and will involve upgrading and widening to six lanes a 102km section of National Highway 8 (NH-8) from Ahmedabad-Vadodara. The project also includes upgrading 92km of the existing Ahmedabad-Vadodara expressway. Work is expected to take three years to complete, and the 25-year concession deal for the project has been agreed bet
February 23, 2012 Read time: 2 mins
A major highway deal has been agreed for a road project in Gujarat, India, worth an estimated US$810.8 million.

It will be handled under the build, finance, operate and transfer basis and will involve upgrading and widening to six lanes a 102km section of National Highway 8 (NH-8) from Ahmedabad-Vadodara.

The project also includes upgrading 92km of the existing Ahmedabad-Vadodara expressway.

Work is expected to take three years to complete, and the 25-year concession deal for the project has been agreed between IRB Ahmedabad Vadodara Super Express Tollway unit of 2700 IRB Infrastructure Developers and the 292 National Highways Authority of India (NHAI).

In another development, a joint venture is being established comprising 3063 Ennore Port, L&T Ship Building and 2701 Tamilnadu Industrial Development Corporation (TIDCO) for construction of a 25.5km road project to connect Kattupalli port and Ennore port in Chennai.

The road will be constructed on a build, operate and transfer basis at a cost expected to be around $81.5 million.

Related Content

  • India highway works planned
    July 28, 2020
    Key highway works are being planned in India.
  • India’s new expressway link
    April 12, 2021
    Accelerated road construction methods are being used to build an expressway link in India, setting records along the way
  • India plans major infrastucture investment
    April 5, 2012
    India says it turned its Commonwealth Games into a world-class success, and now it aims to do the same with its infrastructure. Patrick Smith reports On October, 2010 India put itself on the world stage, and disaster appeared to loom as a catalogue of problems dogged its biggest ever sporting event. Costing nearly US$2 billion to stage, the most expensive Commonwealth Games ever were, according to some, in doubt. After years of planning some projects were incomplete, there were health scares and a br
  • HCC scoops key India road build deal
    May 4, 2012
    The National Highways Authority of India (NHAI) has awarded a US$151.70million contract to HCC Concessions to expand the NH-8's Vadodara-Surat section into six lanes. The contract, for a 12-year concession period, includes 30 months to construct the new six-lane section. The toll-based project also includes the development of an extra-dosed bridge with four lanes across Gujarat's Narmada River.