Skip to main content

Hertfordshire’s impressive Integrated Transport Control Centre

The road network of the southern English county of Hertfordshire, near London, is one of the busiest in the country, with an estimated 4.5 million journeys being made on the network every day. Combine this with the 7,783 reported incidents on Hertfordshire’s roads in 2012 and it’s easy to see how the network becomes congested. This is where the Hertfordshire Integrated Transport Control Centre (ITCC) comes in. From this facility in Hertford, officers from Hertfordshire County Council and their highways c
September 26, 2013 Read time: 3 mins
A Ringway Response Crew tackle a major lorry fuel tank spill after the Hertfordshire Integrated Transport Control Centre (ITCC) notified them of an accident on the busy A1081 near St Albans

The road network of the southern English county of Hertfordshire, near London, is one of the busiest in the country, with an estimated 4.5 million journeys being made on the network every day. Combine this with the 7,783 reported incidents on Hertfordshire’s roads in 2012 and it’s easy to see how the network becomes congested.

This is where the Hertfordshire Integrated Transport Control Centre (ITCC) comes in. From this facility in Hertford, officers from Hertfordshire County Council and their highways contractor 2393 Ringway monitor the road network using a range of CCTV and traffic cameras. Such close monitoring of the roads around the county means that the ITCC operatives can respond quicker than ever before to emergency situations or to ease congestion.

One such situation occurred on the A1081 London Colney Bypass, St Albans, at the end of June 2013. A lorry carrying a full tank of diesel was involved in an incident with a car resulting in contents of the lorry’s fuel tank being spilt on both southbound lanes of the carriageway. The spill stretched for approximately 100m and required immediate action.

After being notified of the incident by Hertfordshire Police at 7.05pm on 25 June, the ITCC dispatched a Ringway Response Crew to investigate.

Once on site, the crew began the diesel clean-up with further crews dispatched by the ITCC as the full extent of the spill became clear. As work began the ITCC monitored the site through CCTV and intelligent transport system cameras in the area, paying close attention to the effect of the necessary road closures on the local network. A number of diversions were put in place and monitored to help ease congestion around the site while work to complete the clean-up continued into the early hours of the morning. With the diversions still in place, the decision was taken that the damage to the carriageway surface was too severe and required resurfacing. Crews from Ringway worked with colleagues from 3281 Eurovia Surfacing to ensure the surface was replaced in a timely manner and the road could be reopened as soon as possible. With all works complete and the surface dried the road closures and diversions were lifted and the road reopened at around 19:30 hours on 26 June.

Throughout the entire incident the ITCC was able to keep stakeholders and the public informed of the works progress and diversion routes through local traffic information broadcasts and social media.

With the introduction of the forthcoming ‘Highways Live’ website, the ITCC will be at the heart of real-time traffic information for the county.

For more information on companies in this article

Related Content

  • Highway 99 revisited
    March 6, 2024
    David Arminas recently returned to Seattle for an inside look at some of the features of the now-complete SR99 tunnel that was a World Highways key project report in November 2017.
  • Two German autobahns benefit from new Wirtgen concrete slipforming technology
    November 15, 2013
    Two important routes in Germany, the A9 and A6 autobahn highways, have benefited from the use of the latest Wirtgen slipforming machines. The A9 is a particularly important route in Germany as this 529km link connects capital Berlin with the southern city of Munich, running through Brandenburg, Saxony-Anhalt, Saxony, Thuringia and Bavaria.
  • Driving recycling, unlocking the value of UK roads
    May 16, 2016
    Concerned about the risk of material failure, many local authorities and network operators have been reluctant to incorporate high recycled content asphalt into the surface course of UK roads. David Smith, development director at FM Conway, explained why asphalt recycling is crucial to maximising the value of Britain’s largely untapped road asset.
  • New traffic solutions for the UK
    July 15, 2015
    Two major developments being introduced will help optimise traffic flow on routes carrying high volumes of vehicles/day. An installation of Flexicon’s flexible conduit will help keep the traffic flowing on one of the busiest sections of the M6 motorway through Birmingham by protecting power and data cabling for overhead gantries and CCTV cameras. On behalf of Highways England, who is implementing a hard shoulder running scheme between junctions 5 and 8, contractor’s Carillion is using the 63mm diameter L