Skip to main content

Hertfordshire’s impressive Integrated Transport Control Centre

The road network of the southern English county of Hertfordshire, near London, is one of the busiest in the country, with an estimated 4.5 million journeys being made on the network every day. Combine this with the 7,783 reported incidents on Hertfordshire’s roads in 2012 and it’s easy to see how the network becomes congested. This is where the Hertfordshire Integrated Transport Control Centre (ITCC) comes in. From this facility in Hertford, officers from Hertfordshire County Council and their highways c
September 26, 2013 Read time: 3 mins
A Ringway Response Crew tackle a major lorry fuel tank spill after the Hertfordshire Integrated Transport Control Centre (ITCC) notified them of an accident on the busy A1081 near St Albans

The road network of the southern English county of Hertfordshire, near London, is one of the busiest in the country, with an estimated 4.5 million journeys being made on the network every day. Combine this with the 7,783 reported incidents on Hertfordshire’s roads in 2012 and it’s easy to see how the network becomes congested.

This is where the Hertfordshire Integrated Transport Control Centre (ITCC) comes in. From this facility in Hertford, officers from Hertfordshire County Council and their highways contractor 2393 Ringway monitor the road network using a range of CCTV and traffic cameras. Such close monitoring of the roads around the county means that the ITCC operatives can respond quicker than ever before to emergency situations or to ease congestion.

One such situation occurred on the A1081 London Colney Bypass, St Albans, at the end of June 2013. A lorry carrying a full tank of diesel was involved in an incident with a car resulting in contents of the lorry’s fuel tank being spilt on both southbound lanes of the carriageway. The spill stretched for approximately 100m and required immediate action.

After being notified of the incident by Hertfordshire Police at 7.05pm on 25 June, the ITCC dispatched a Ringway Response Crew to investigate.

Once on site, the crew began the diesel clean-up with further crews dispatched by the ITCC as the full extent of the spill became clear. As work began the ITCC monitored the site through CCTV and intelligent transport system cameras in the area, paying close attention to the effect of the necessary road closures on the local network. A number of diversions were put in place and monitored to help ease congestion around the site while work to complete the clean-up continued into the early hours of the morning. With the diversions still in place, the decision was taken that the damage to the carriageway surface was too severe and required resurfacing. Crews from Ringway worked with colleagues from 3281 Eurovia Surfacing to ensure the surface was replaced in a timely manner and the road could be reopened as soon as possible. With all works complete and the surface dried the road closures and diversions were lifted and the road reopened at around 19:30 hours on 26 June.

Throughout the entire incident the ITCC was able to keep stakeholders and the public informed of the works progress and diversion routes through local traffic information broadcasts and social media.

With the introduction of the forthcoming ‘Highways Live’ website, the ITCC will be at the heart of real-time traffic information for the county.

For more information on companies in this article

Related Content

  • Brazilian contractor uses novel methods for high quality road
    January 5, 2015
    Cold-in place recycling method provides fast road rebuild in Brazil In Brazil a road contractor has carried out a high quality road rebuilding job, using novel techniques. Contractor Brown Brown is located in Santa Teresinha in the state of Bahia and recently carried out a two-week job for the company to rehabilitate sections of highway BR-381. The highway is an important route in Brazil and runs from Sao Paulo to Belo Horizonte. Highway BR-381 or Rodovia Fernão Dias, as it is called, stretches some 576km
  • ASECAP: maintenance mindshift turns spending into investment
    August 4, 2017
    With an estimated value of €8 trillion, the road infrastructure is probably the European Union’s largest single asset. It accounts for 83% of passenger journeys and more than 70% of freight movement. Despite this importance, global investment in roads - especially maintenance - has fallen, said Christophe Nicodeme, European Road Federation secretary general. There are grave consequences, noted Nicodeme in his opening keynote address to the recent Study and Information Days gathering, an annual event for mem
  • Using breakers to demolish redundant overpass
    December 11, 2015
    A demolition job in California was carried out successfully using a hydraulic breaker fitted to an excavator. An overpass on Highway 91 in Southern California had to be removed, with the contractor opting to use a hydraulic breaker for the job. The work was carried out within the 22-hour possession period set by the local authorities, allowing the route to reopen to traffic on time and minimising transport delays. The work was carried out safely and precisely, due to the use of suitable equipment. The re
  • Flyover removal completed successfully
    February 15, 2021
    A flyover removal project has been completed successfully in the UK.