Skip to main content

Fast, safe and sustainable transport for Johannesburg

GTZ highlights a pioneering scheme illustrating the potential of Bus Rapid Transit systems as a viable approach to alleviate the traffic and social problems faced by large cities worldwide
February 14, 2012 Read time: 5 mins
Planning for the system, which is called Rea Vaya (we are going) began in 2006 and the plan envisions expanding to 122KM of busways and 150 stations for carrying over 430,000 passengers a day by 2013

GTZ highlights a pioneering scheme illustrating the potential of Bus Rapid Transit systems as a viable approach to alleviate the traffic and social problems faced by large cities worldwide

Most major cities worldwide have been characterised by the phenomenon of steadily growing urbanisation accompanied by exponentially increasing numbers of private motorised vehicles.

This has led to congested roads and sprawling cities, with commuters having to travel long distances to and from work. Despite huge investments in road infrastructure, the problem has been worsening, and Johannesburg, South Africa's largest city, is no exception. Several corridors of the city experience area-wide traffic chaos on a daily basis.

Long distances and long transport times are not only extremely annoying for commuters they also lead to higher economic costs for the entire city. In addition, social problems and costs imposed by the long travel times are huge.

Education and health facilities become more difficult to access for many city dwellers, and the influx of people from the countryside into the city is unlikely to stop in the near future.

Johannesburg will continue to grow. So, if it is not possible to decrease the distances in the short term, one has to look at decreasing the time spent on transportation. This means providing the poor, residing in the townships at the outskirts of the city, with a fast, convenient and safe way to access their jobs situated in the city centre, in other major employment nodes or in the neighbourhoods of the wealthy.

BRT system

Experiences drawn from some other large cities in developing countries have demonstrated that Bus Rapid Transit (BRT) systems are a sustainable travel option and a good way to ease traffic situations.

The BRT buses run in exclusive, separated lanes in the centre of existing roads, making them as fast as light rail. Priority traffic signal controls for buses further increase their speed. Tickets are purchased at stations that are also in the central reserve; and their functional design allows for a smooth process of boarding and alighting.

In order to serve both kerb-side stops, in mixed traffic, and mid-road stations within the exclusive busways, all buses are equipped with doors on each side.

Security and service personnel are permanently present at every station during operating hours.

Compared to other public transport modes, such as metros or trams, BRT can claim by far the best cost-benefit ratio. The times taken for construction and implementation, as well as the operational costs, are considerably less than with rail-based mass transit systems.

In order to operate a BRT, one lane of motor traffic in each direction usually has to be removed. On the other hand, up to 17,000 passengers per hour, per direction can travel by BRT, whereas in mixed traffic conditions, the figure is only approximately 2,200 passengers per hour, per direction.

Current status/prospects

Encouraged by the successful bid to host the 2010 2623 Fifa World Cup, South Africa committed itself to improving public transportation and initiated ambitious BRT projects in several of the World Cup host cities.

The first full BRT-System, with 33 stations and 25.5km of exclusive busways, has been implemented in Johannesburg.

Planning for the system, which is called Rea Vaya (We are Going) began in 2006 and the plan envisions expanding to 122km of busways and 150 stations for carrying over 430,000 passengers a day by 2013. This is roughly comparable to the daily number of passengers using the mass transit system operating in the German city of Frankfurt (500,000 passengers),

which had been the object of decades of planning and development.

In August 2009, 40 buses began their maiden trip on the 25.5km Soweto to Johannesburg Inner City line. By May 2010, several feeder routes connecting parts of Soweto, such as Naledi and Protea Glen, to the trunk route were brought into operation, and there are currently some 143 buses operating. These were all newly purchased and comply with the latest environmental and comfort standards.

The first expansion of Rea Vaya (phase 1B) is under construction and is expected to be completed by August 2011. Phase 1C is still in the planning stages.

Both stadiums that hosted World Cup matches in Johannesburg (Ellis Park and Soccer City) are located on the trunk route and are served by Rea Vaya stations. These offer connections by BRT buses to other destinations and public transport services.

The benefits

 Thanks to the BRT, Johannesburg will have an advanced public transport system that integrates the two historically disadvantaged townships of Soweto and Alexandra into the greater municipality of Johannesburg.

The poorer inhabitants of Johannesburg particularly benefit from the BRT, in terms of

both time and money. A ride on the BRT in Johannesburg is 50% cheaper than a ride in one of the many minibus taxis in the city. However, the BRT is not only a sustainable transport option for the poor. The car-driving middle class also benefits.

Indeed, the city of Johannesburg hopes that about 15% of residents living close to bus routes will be encouraged to shift from being users of private vehicles to becoming users of public transport. This would not only relieve the traffic situation but also contribute significantly to reducing air pollution in the city.

The challenges

One of the major challenges that the BRT faced was competition with the minibus taxi industry. On BRT routes, the minibus taxis are no longer competitive in terms of speed, price, safety or service quality, and the operators were faced with the fear of losing their jobs.

The city's political leaders and administration have attempted to prevent this by integrating affected taxi owners into the planning and implementation of the project from the outset. They were notably given the option of joining the bus operating company as shareholders. As a result, hundreds of former taxi staff are today working for Rea Vaya as bus drivers or station staff.

2626 GTZ (the German agency for Technical Assistance) has been actively involved with the Johannesburg BRT since inception. The KfW Bank Group has supported the project with e2 million by request of the German Federal Government.

GTZ further facilitates the implementation process and provides training programmes and expertise to support the BRT system in the city.

For more information on companies in this article

Related Content

  • Mississippi road rebuild contract for Michael Baker
    March 6, 2018
    Michael Baker International has established a partnership with the Mississippi Department of Transportation (MDOT) to rebuilt a 13km stretch of US Route 49 in the Jackson area. The firm won the US$19.3 million Construction Engineering and Inspection (CE&I) contract in late 2017. Under the terms of the deal, the firm will prioritise safety, communication and efficiency to complete the project.
  • Bentley’s Be Inspired Awards highlight innovation in software use
    January 6, 2015
    Innovation, from design to on-site execution, is alive and well, thanks to a good helping of software application. David Arminas reports from software developer Bentley’s annual global conference, held this year in London Successful project delivery is increasingly about hard men and women using software to get the job done and this year’s global conference in London by US-based software developer Bentley highlighted some innovative - and startling - examples. As usual, the Year in Infrastructure 2014
  • IBI’s Routemapper charts new territory with Highways England
    September 14, 2016
    Mapping the asset High-speed data collection just got faster for England’s newly created strategic roads operator Highways England’s establishment as a publicly held company in 2015 created a need for a highly accurate asset inventory. This was potentially very costly and had serious safety implications. As well as its relationships with numerous managing agents and contractors, assets include 35,300km of highway, 12,100km of earthworks, 23,200km of safety fences, 150,000 technology assets and sig
  • Increasing demand for geosynthetics reinforcement
    May 3, 2012
    Geosynthetics have a wide variety of uses and these include providing extra strength in highway construction. Demand for geosynthetics in the United States alone is projected to increase 4.4% per year through to 2010 to more than 727 million m². Geosynthetics, used worldwide in the highway sector for strengthening, include geotextiles, geomembranes, geonets, geogrids, geosynthetic clay liners, preformed geocomposites, geocells and geofoams. The US advances will be fuelled by a recovery in nonbuilding constr