Skip to main content

Colombia road tolling contract

DEVISAB recently awarded a major contract to modernise the control centre and renew three toll plazas on a highway linking the municipality of Chia with Girardot and Soacha, west of capital Bogota Indra already has a strong position in the Colombian infrastructure and transport industry. The firm operates flagship projects such as the Bogota-Villavicencio divided highway and the Medellin urban mobility system The contract is to renovate the technology used at three toll plazas and a control centre fo
June 20, 2016 Read time: 2 mins
Bogota’s transport links will be improved with the improved highway links
DEVISAB recently awarded a major contract to modernise the control centre and renew three toll plazas on a highway linking the municipality of Chia with Girardot and Soacha, west of capital Bogota

5264 Indra already has a strong position in the Colombian infrastructure and transport industry. The firm operates flagship projects such as the Bogota-Villavicencio divided highway and the Medellin urban mobility system

The contract is to renovate the technology used at three toll plazas and a control centre for the road linking the municipalities of Chia, Mosquera, Girardot and Soacha. The deal is worth around US$2.4 million and the work is due for completion in the second quarter of 2016.

Under the terms of the deal, Indra will deploy toll and electronic toll systems on 21 collection lanes at the toll plazas of Tebaida, Mondoñedo and the Soacha municipality access lane. These will be used along a 159km stretch of the highway that runs north to south through the Department of Cundinamarca, west of Colombia’s capital Bogota.

The installation will utilise innovative electronic tolling technology developed by Indra. The firm says that this will allow the concessionaire to manage finances, users, accounts, payment methods and also provide report generation. Indra will is also deploying CCTV surveillance technology for the toll plazas, as well as a sophisticated license plate recognition package, signalling platforms and other systems.

The project consolidates Indra's position as technology partner to the Colombian infrastructure sector, where it has deployed its smart technology for traffic management and public transportation in Medellin. It is also equipping 18 tunnels on the Bogota-Villavicencio divided highway with traffic management and tunnel control systems, while there are other projects also underway. Indra's toll technology is already used in Colombia on the Devinorte and Los Llanos highways, the Odinsa toll concession for INVIAS and the Autopistas del Café.

For more information on companies in this article

Related Content

  • A new tolled highway brings change for Austin, Texas
    February 10, 2020
    A new highway section in Austin, Texas marks a major departure for the southern US city
  • Mississippi road rebuild contract for Michael Baker
    March 6, 2018
    Michael Baker International has established a partnership with the Mississippi Department of Transportation (MDOT) to rebuilt a 13km stretch of US Route 49 in the Jackson area. The firm won the US$19.3 million Construction Engineering and Inspection (CE&I) contract in late 2017. Under the terms of the deal, the firm will prioritise safety, communication and efficiency to complete the project.
  • Slovakia: D4/R7 Bratislava bypass work to start early this year
    January 10, 2017
    Construction will start early this year on 59km of highway as part of the D4/R7 bypass of the Slovakian capital Bratislava. Ferrovial through its subsidiaries Cintra Infraestructuras and Ferrovial Agroman is leading the consortium on the public-private partnerships deal worth around €1.9 billion, according to media reports. Ferrovial reached financial close on the project in June, noting that their investment would be around €975 million. The first stage of the design, build, financing, operate and ma
  • India highway link opens to traffic
    March 6, 2018
    A new stretch of highway is now opening to traffic in India. The 80km stretch of highway runs between Kundli and through Manesar to Palwal. Called the KMP Expressway, the route has had something of a checkered history and has been completed somewhat later than originally intended. The concession was originally awarded in 2006 and the road should have been completed in 2009, according to the planned timeline.