Skip to main content

Colombia road tolling contract

DEVISAB recently awarded a major contract to modernise the control centre and renew three toll plazas on a highway linking the municipality of Chia with Girardot and Soacha, west of capital Bogota Indra already has a strong position in the Colombian infrastructure and transport industry. The firm operates flagship projects such as the Bogota-Villavicencio divided highway and the Medellin urban mobility system The contract is to renovate the technology used at three toll plazas and a control centre fo
June 20, 2016 Read time: 2 mins
Bogota’s transport links will be improved with the improved highway links
DEVISAB recently awarded a major contract to modernise the control centre and renew three toll plazas on a highway linking the municipality of Chia with Girardot and Soacha, west of capital Bogota

5264 Indra already has a strong position in the Colombian infrastructure and transport industry. The firm operates flagship projects such as the Bogota-Villavicencio divided highway and the Medellin urban mobility system

The contract is to renovate the technology used at three toll plazas and a control centre for the road linking the municipalities of Chia, Mosquera, Girardot and Soacha. The deal is worth around US$2.4 million and the work is due for completion in the second quarter of 2016.

Under the terms of the deal, Indra will deploy toll and electronic toll systems on 21 collection lanes at the toll plazas of Tebaida, Mondoñedo and the Soacha municipality access lane. These will be used along a 159km stretch of the highway that runs north to south through the Department of Cundinamarca, west of Colombia’s capital Bogota.

The installation will utilise innovative electronic tolling technology developed by Indra. The firm says that this will allow the concessionaire to manage finances, users, accounts, payment methods and also provide report generation. Indra will is also deploying CCTV surveillance technology for the toll plazas, as well as a sophisticated license plate recognition package, signalling platforms and other systems.

The project consolidates Indra's position as technology partner to the Colombian infrastructure sector, where it has deployed its smart technology for traffic management and public transportation in Medellin. It is also equipping 18 tunnels on the Bogota-Villavicencio divided highway with traffic management and tunnel control systems, while there are other projects also underway. Indra's toll technology is already used in Colombia on the Devinorte and Los Llanos highways, the Odinsa toll concession for INVIAS and the Autopistas del Café.

For more information on companies in this article

Related Content

  • Success of toll road operators' conference
    July 12, 2012
    The 37th ASECAP Annual Study and Information Days held in Krakow, Poland, gathered some 300 road transport CEOs, experts and government decision-makers making the event "a huge success." Patrick Smith reports Toll road operators from across Europe have met to discuss the state of their businesses in the current economic climate and how to tackle it. Fabrizio Palenzona, the outgoing President of ASECAP (the European professional Association of Operators of Toll Road Infrastructures) and president of AISCAT (
  • Colombia’s Toyo Tunnel project underway
    September 14, 2018
    Construction is ongoing for Colombia’s Toyo tunnel project in Antioquia. The tunnel is located between Giraldo and Canasgordas and some 120km from Medellin. The tunnel should open to traffic in 2024 if the project sticks to its planned schedule. The main tunnel section will measure some 9.85km-long although the project involves drilling side tunnels and emergency areas. The work is costing US$588.4 million.
  • Colombia infrastructure expansion plan underway
    August 22, 2017
    Colombia is moving ahead steadily with its 4G road development scheme. According to the Colombian Chamber of Infrastructure (CCI), the Colombian Government has awarded 31 of the 4G projects to date. And of these 31 projects, 21 are being built at present with another eight in the process of securing financing. In all these 21 active projects and the eight close to commencement are worth a total of US$4.37 billion. The Colombian Government hopes that financing will be secured for a further two projects by th
  • Colombia is setting out plans for key road projects
    July 28, 2015
    The Colombian Government has approved the country's eighth public-private partnership (PPP) to transform the Bogota-Girardot route into a six-lane highway. The project will require an investment of some US$596.6 million. Colombia’s Transport Ministry says that the project will improve road connectivity between the capital and Buenaventura. The work will require maintenance, restoration and improvement works over a distance of some 146km. Construction work on the project as well as the Circunvalar de la Pros