Skip to main content

Briefly, and to the point

Duplex A86 tunnel. The low risk found for driving through the tunnel is primarily due to the low volume of traffic of around 11,000 vehicles/day and the ban on HGVs and the transport of hazardous goods.
April 10, 2012 Read time: 4 mins
The Hvalfjordur Tunnel in Iceland gained EuroTAP's poorest test result. Plans for a new tube have been hit by the financial crisis. (EuroTAP, Johann Kristjansson, photographer)

The low risk found for driving through the tunnel is primarily due to the low volume of traffic of around 11,000 vehicles/day and the ban on HGVs and the transport of hazardous goods.

Unidirectional traffic, sufficiently wide lanes, emergency lanes and lighting are the main reasons for the very good result for preventive measures.

The tunnel is monitored around-the-clock in a tunnel control centre manned by trained staff, and incidents are automatically reported to the control centre by video link. If necessary, motorists are guided using traffic lights and variable traffic signs, and information is provided via information displays, traffic radio and loudspeakers.

An automatic fire alarm system detects fires, activates ventilation, and closes the tunnel, and the short distance to be covered by the fire brigade, the stationary fire sprinkler system and the supply of fire-fighting water in the tunnel ensures effective fire fighting.

An emergency response plan and regular drills ensure good cooperation between the tunnel control centre and the emergency services.

In the event of fire, there are good preconditions for effective self-rescue. The ventilation system extracts the smoke near the seat of the fire out of the tunnel. This means that people in the tube can use the well-signposted emergency exits to the neighbouring tube in order to leave the tunnel through a largely smoke-free environment.

Escape shafts for tunnel evacuation are provided every 1,000m.

Duplex A86 2436 EuroTAP rating: very good, best test result
Location: France, near Paris, between Rueil Malmaison and Vaucresson (access A13)
Year opened: 2009 (first stage of construction)
Length: 4,530m
Portal height level: 173/17m above sea level
Number of tubes: two, unidirectional traffic
Speed limit: 70km/hour
Vehicles per day: 11,000
Share of HGVs: 0 (banned) Breakdowns/accidents/fires: 28/0/0 Risk: Low
Hvalfjörður Tunnel

The medium risk found for driving through the tunnel is primarily due to its 5,770m length and steep gradient of more than 8%, although the traffic volume of 5,400 vehicles and number of hazardous goods transports each day are rather low.

Preventive measures are acceptable, at least with a view to the structure, and primarily comprise sufficiently wide lanes and lay-bys. However, lighting is too weak, and while the tunnel is monitored around the clock in a tunnel control centre manned by trained staff, however, video surveillance is incomplete.

Incidents in the tunnel are not automatically reported to the tunnel control centre. Tunnel staff rely on reports made by motorists using either the emergency (or their own mobile) phones. If necessary, motorists are guided using traffic lights and variable traffic signs and information is provided on displays and traffic radio.

Hvalfjörður Tunnel (EuroTAP rating: very poor, poorest test result)
Location:Iceland, near Akranes, Highway No. 1 between Reykjavik and Akranes
Year opened: 1998
Length: 5,770m
Portal height level: 10/20m above sea level
Number of tubes: one (bi-directional traffic)
Speed limit: 70km/hour
Vehicles per day: 5,400
Share of HGVs: 5%
Breakdowns/accidents/fires: 26/8/0
Risk: Medium
There is no automatic fire alarm system, and if a fire breaks out the tunnel control centre must activate the ventilation system manually, close the tunnel and notify the fire brigade, which has to travel a long distance. This, and the insufficient supply of fire-fighting water with just one hydrant in the middle of the tunnel, makes fire-fighting difficult. At least, an emergency response plan coordinates cooperation between the tunnel control centre and emergency services. Emergency drills are not held regularly.

The preconditions for effective self-rescue in a fire badly need to be improved. Due to the long ventilation section along the entire length of the tunnel, smoke located a long distance from the seat of the fire cannot be prevented from sinking down from the tunnel ceiling.

Moreover, longitudinal flow in the tunnel is not considered in ventilation control. The steep gradient in the tunnel also encourages smoke to spread. This can lead to smoke spreading throughout the entire tunnel and, considering the lack of additional emergency exits and the hence long distances to be covered to the portals, this could be dangerous. Orientation in a fire is also difficult because these escape routes are not marked by evacuation lighting.

For more information on companies in this article

Related Content

  • Focusing on workzone safety systems
    March 16, 2012
    The US has seen a major reduction in deaths following accidents in its highway construction work zones, while Europe and other parts of the world are looking at new safety technology and systems to trigger a similar trend. Guy Woodford reports. Work in the US to reduce the likelihood of potentially fatal accidents at highway work zones is paying dividend.
  • Norway’s record breaking undersea road tunnel
    February 25, 2015
    The world's deepest road tunnel is currently in construction near Stavanger in Norway but is only the prelude to even larger projects - report and photographs by Adrian Greeman. Norway's convoluted coastline of fjords and high mountains is famously scenic but also a major problem for transport and connections. The country has long experience of constructing tunnels as a result. Now a series of tunnels underway, or in design, around the oil industry city of Stavanger will stretch its skills more than usual.
  • Mexico: underwater tunnel in Latin America
    May 8, 2015
    Mexico will benefit from an important new underwater tunnel - Mauro Nogarin writes. The city of Coatzacoalcos is located at the mouth of the river of the same name, in the Gulf of Mexico, 302km from the city of Salina Cruz, Oaxaca, in the east end of trans-isthmian corridor and at the southern end of Veracruz State. The city is seeing a key development as currently construction is 85% completed on the first immersed tube, underwater tunnel in Latin America. The reasons why experts chose this type of tunne
  • Tunnel construction benefits from improved visibility
    November 14, 2012
    Major new tunnel construction projects will, on completion, help secure more reliable journey times for hundreds of thousands of people across the world. Meanwhile, as Guy Woodford reports, leading ITS solution companies have been providing vital equipment for major road tunnels The Martina Tunnel Boring Machine (TBM), a 4,500tonne Herrenknecht Earth Pressure Balance Shield said to have a world record diameter of 15.55m, has required just under a year to build the first of two tunnel tubes for the 2.5km lon