Skip to main content

Briefly, and to the point

Duplex A86 tunnel. The low risk found for driving through the tunnel is primarily due to the low volume of traffic of around 11,000 vehicles/day and the ban on HGVs and the transport of hazardous goods.
April 10, 2012 Read time: 4 mins
The Hvalfjordur Tunnel in Iceland gained EuroTAP's poorest test result. Plans for a new tube have been hit by the financial crisis. (EuroTAP, Johann Kristjansson, photographer)

The low risk found for driving through the tunnel is primarily due to the low volume of traffic of around 11,000 vehicles/day and the ban on HGVs and the transport of hazardous goods.

Unidirectional traffic, sufficiently wide lanes, emergency lanes and lighting are the main reasons for the very good result for preventive measures.

The tunnel is monitored around-the-clock in a tunnel control centre manned by trained staff, and incidents are automatically reported to the control centre by video link. If necessary, motorists are guided using traffic lights and variable traffic signs, and information is provided via information displays, traffic radio and loudspeakers.

An automatic fire alarm system detects fires, activates ventilation, and closes the tunnel, and the short distance to be covered by the fire brigade, the stationary fire sprinkler system and the supply of fire-fighting water in the tunnel ensures effective fire fighting.

An emergency response plan and regular drills ensure good cooperation between the tunnel control centre and the emergency services.

In the event of fire, there are good preconditions for effective self-rescue. The ventilation system extracts the smoke near the seat of the fire out of the tunnel. This means that people in the tube can use the well-signposted emergency exits to the neighbouring tube in order to leave the tunnel through a largely smoke-free environment.

Escape shafts for tunnel evacuation are provided every 1,000m.

Duplex A86 2436 EuroTAP rating: very good, best test result
Location: France, near Paris, between Rueil Malmaison and Vaucresson (access A13)
Year opened: 2009 (first stage of construction)
Length: 4,530m
Portal height level: 173/17m above sea level
Number of tubes: two, unidirectional traffic
Speed limit: 70km/hour
Vehicles per day: 11,000
Share of HGVs: 0 (banned) Breakdowns/accidents/fires: 28/0/0 Risk: Low
Hvalfjörður Tunnel

The medium risk found for driving through the tunnel is primarily due to its 5,770m length and steep gradient of more than 8%, although the traffic volume of 5,400 vehicles and number of hazardous goods transports each day are rather low.

Preventive measures are acceptable, at least with a view to the structure, and primarily comprise sufficiently wide lanes and lay-bys. However, lighting is too weak, and while the tunnel is monitored around the clock in a tunnel control centre manned by trained staff, however, video surveillance is incomplete.

Incidents in the tunnel are not automatically reported to the tunnel control centre. Tunnel staff rely on reports made by motorists using either the emergency (or their own mobile) phones. If necessary, motorists are guided using traffic lights and variable traffic signs and information is provided on displays and traffic radio.

Hvalfjörður Tunnel (EuroTAP rating: very poor, poorest test result)
Location:Iceland, near Akranes, Highway No. 1 between Reykjavik and Akranes
Year opened: 1998
Length: 5,770m
Portal height level: 10/20m above sea level
Number of tubes: one (bi-directional traffic)
Speed limit: 70km/hour
Vehicles per day: 5,400
Share of HGVs: 5%
Breakdowns/accidents/fires: 26/8/0
Risk: Medium
There is no automatic fire alarm system, and if a fire breaks out the tunnel control centre must activate the ventilation system manually, close the tunnel and notify the fire brigade, which has to travel a long distance. This, and the insufficient supply of fire-fighting water with just one hydrant in the middle of the tunnel, makes fire-fighting difficult. At least, an emergency response plan coordinates cooperation between the tunnel control centre and emergency services. Emergency drills are not held regularly.

The preconditions for effective self-rescue in a fire badly need to be improved. Due to the long ventilation section along the entire length of the tunnel, smoke located a long distance from the seat of the fire cannot be prevented from sinking down from the tunnel ceiling.

Moreover, longitudinal flow in the tunnel is not considered in ventilation control. The steep gradient in the tunnel also encourages smoke to spread. This can lead to smoke spreading throughout the entire tunnel and, considering the lack of additional emergency exits and the hence long distances to be covered to the portals, this could be dangerous. Orientation in a fire is also difficult because these escape routes are not marked by evacuation lighting.

For more information on companies in this article

Related Content

  • New tunnelling technology offering greater efficiency
    January 4, 2017
    Tunnelling technology is seeing major developments that will boost construction efficiency - Mike Woof writes Both in tunnel drilling and TBM systems, new machines are now being built that offer major gains in performance. Sandvik is introducing a number of major new models developments to its tunnelling drill range. Three new tunnelling jumbos are now available that suit different drilling requirements, the DD422iE, DT912D and DT922i. The firm says that its advanced DD422iE rig offers major advantage
  • Tuen Mun to Chek Lap Kok Tunnel project
    December 22, 2016
    It is not only the scale of the Tuen Mun to Chek Lap Kok tunnel that impressed delegates but the number of novel technologies that Dragages Hong Kong, a Bouygues Construction subsidiary, is employing on this project. The 4.6 km tunnel running 60m below sea level is part of a strategic new route linking Hong Kong’s airport on Lantau Island and the New Territories. Dragage’s contract includes reclamation of 16.5-hectares at the tunnel’s north end to accommodate the north portal and a ventilation building. Wo
  • Indra tech to boost safety on Colombia highway
    August 2, 2019
    Indra is to supply traffic management technology, communications and toll systems to the Bucaramanga-Barrancabermeja-Yondó highway in Colombia, in a deal valued at €10.5 million. The company says its line of Mova Traffic solutions will manage the 152km roadway, which unites the Santander department in the Andes mountains with the country's main oil production centres. Indra’s Horus integrated traffic and tunnel management platform is expected to provide operators with real-time information of everyt
  • Brine spraying can boost winter road safety and cut materials costs
    February 16, 2015
    A study on the use of a brine sprayer on the A8 Autobahn in Germany has yielded valuable data - *Jo Rommeswinkel writes. Since 2007, Autobahnplus Services (a+S) has been providing the operation and maintenance services on the 52km concession Autobahn A8 between Munich and Augsburg in Bavaria, a region renowned for its severe winter maintenance conditions. The Munich Augsburg section comprises 48km of six-lane dual carriageway and 4km of four-lane dual carriageway. Part of the road surface consists of low-no