Skip to main content

Briefly, and to the point

Duplex A86 tunnel. The low risk found for driving through the tunnel is primarily due to the low volume of traffic of around 11,000 vehicles/day and the ban on HGVs and the transport of hazardous goods.
April 10, 2012 Read time: 4 mins
The Hvalfjordur Tunnel in Iceland gained EuroTAP's poorest test result. Plans for a new tube have been hit by the financial crisis. (EuroTAP, Johann Kristjansson, photographer)

The low risk found for driving through the tunnel is primarily due to the low volume of traffic of around 11,000 vehicles/day and the ban on HGVs and the transport of hazardous goods.

Unidirectional traffic, sufficiently wide lanes, emergency lanes and lighting are the main reasons for the very good result for preventive measures.

The tunnel is monitored around-the-clock in a tunnel control centre manned by trained staff, and incidents are automatically reported to the control centre by video link. If necessary, motorists are guided using traffic lights and variable traffic signs, and information is provided via information displays, traffic radio and loudspeakers.

An automatic fire alarm system detects fires, activates ventilation, and closes the tunnel, and the short distance to be covered by the fire brigade, the stationary fire sprinkler system and the supply of fire-fighting water in the tunnel ensures effective fire fighting.

An emergency response plan and regular drills ensure good cooperation between the tunnel control centre and the emergency services.

In the event of fire, there are good preconditions for effective self-rescue. The ventilation system extracts the smoke near the seat of the fire out of the tunnel. This means that people in the tube can use the well-signposted emergency exits to the neighbouring tube in order to leave the tunnel through a largely smoke-free environment.

Escape shafts for tunnel evacuation are provided every 1,000m.

Duplex A86 2436 EuroTAP rating: very good, best test result
Location: France, near Paris, between Rueil Malmaison and Vaucresson (access A13)
Year opened: 2009 (first stage of construction)
Length: 4,530m
Portal height level: 173/17m above sea level
Number of tubes: two, unidirectional traffic
Speed limit: 70km/hour
Vehicles per day: 11,000
Share of HGVs: 0 (banned) Breakdowns/accidents/fires: 28/0/0 Risk: Low
Hvalfjörður Tunnel

The medium risk found for driving through the tunnel is primarily due to its 5,770m length and steep gradient of more than 8%, although the traffic volume of 5,400 vehicles and number of hazardous goods transports each day are rather low.

Preventive measures are acceptable, at least with a view to the structure, and primarily comprise sufficiently wide lanes and lay-bys. However, lighting is too weak, and while the tunnel is monitored around the clock in a tunnel control centre manned by trained staff, however, video surveillance is incomplete.

Incidents in the tunnel are not automatically reported to the tunnel control centre. Tunnel staff rely on reports made by motorists using either the emergency (or their own mobile) phones. If necessary, motorists are guided using traffic lights and variable traffic signs and information is provided on displays and traffic radio.

Hvalfjörður Tunnel (EuroTAP rating: very poor, poorest test result)
Location:Iceland, near Akranes, Highway No. 1 between Reykjavik and Akranes
Year opened: 1998
Length: 5,770m
Portal height level: 10/20m above sea level
Number of tubes: one (bi-directional traffic)
Speed limit: 70km/hour
Vehicles per day: 5,400
Share of HGVs: 5%
Breakdowns/accidents/fires: 26/8/0
Risk: Medium
There is no automatic fire alarm system, and if a fire breaks out the tunnel control centre must activate the ventilation system manually, close the tunnel and notify the fire brigade, which has to travel a long distance. This, and the insufficient supply of fire-fighting water with just one hydrant in the middle of the tunnel, makes fire-fighting difficult. At least, an emergency response plan coordinates cooperation between the tunnel control centre and emergency services. Emergency drills are not held regularly.

The preconditions for effective self-rescue in a fire badly need to be improved. Due to the long ventilation section along the entire length of the tunnel, smoke located a long distance from the seat of the fire cannot be prevented from sinking down from the tunnel ceiling.

Moreover, longitudinal flow in the tunnel is not considered in ventilation control. The steep gradient in the tunnel also encourages smoke to spread. This can lead to smoke spreading throughout the entire tunnel and, considering the lack of additional emergency exits and the hence long distances to be covered to the portals, this could be dangerous. Orientation in a fire is also difficult because these escape routes are not marked by evacuation lighting.

For more information on companies in this article

Related Content

  • LED road studs provide tunnel guidance
    February 10, 2012
    Safety in tunnels is of paramount importance, and in 2014 the European Union will be introducing new safety rules for such structures. As in other parts of the world, many tunnels under construction will be built to high standards incorporating the latest technologies. Many others are being upgraded, including the Elbetunnel, Hamburg, Germany, where the first tunnel under the River Elbe was built in 1911.
  • Italy's strategic tunnel link
    August 21, 2012
    The world's largest tunnelling machine is completing Italy's important road connection between Bologna and Florence - Adrian Greeman reports For just under a decade a huge programme of highway construction has been underway in the mountainous region between Bologna and Florence, realigning a section of the A1 highway nearly 70km long. The new section, through major tunnels and across high viaducts, will greatly increase capacity on Italy's most important highway.
  • Kazakhstan’s London road show woos consortia for Almaty ring road
    March 2, 2015
    Kazak and EBRD officials visited London to highlight the possibility of a public-private partnership under the country’s revised PPP legal framework. David Arminas reports. To build a road, you go on the road, and that is what Kazakhstan did in London in mid-December. Representatives of more than 100 organisations, a mix of construction companies and financial institutions, attended the roadshow-style presentation to attract foreign capital for BAKAD, the Almaty Ring Road Concession. The message was that Ka
  • Zipping up road lanes – with Barrier Systems
    September 10, 2018
    QMB has a Lindsay Road Zipper on duty near Montreal. World Highways deputy editor David Arminas climbed aboard As vice president of Canadian barrier specialist QMB, based in Laval, Quebec, Marc-Andre Seguin is sanguine about the future for moveable barriers. On the one hand, it looks good. The oft-stated advantage of moveable barriers is that the systems are cheaper to install than adding a lane or two to a highway or bridge. Directional changes to lanes can boost volume on a road without disrupting tra