Skip to main content

Barrier removal

A novel use of a scrap shear has helped safety upgrades for the A14 highway linking the Italian cities of Bari and Naples. A Promove SC2200 scrap shear has been used to cut and remove old steel guard-rail on the highway.
April 5, 2012 Read time: 1 min
High speed cutting was achieved using the Promove scrap shear, allowing old barrier sections to be removed from an Italian highway
RSSA novel use of a scrap shear has helped safety upgrades for the A14 highway linking the Italian cities of Bari and Naples. A 2689 Promove SC2200 scrap shear has been used to cut and remove old steel guard-rail on the highway.

The 2.5tonne cutter was mounted on a CAT M322D wheeled excavator and was able to cut the sections extract poles and load scraps on a truck waiting just slightly ahead of the cutting zone. The operation was carried out in a single lane as the highway was not closed and traffic was diverted onto another lane.

However the operator made sure that the excavator stayed within the limitations of the working area, ensuring safety for the vehicles driving past.

The SC2200 unit worked fast and productively, allowing the full highway width to be reopened in time for heavy holiday traffic. In addition the unit's 360° hydraulic-powered rotation allowed the driver to position the shear for cutting and to safely load the cut sections onto the truck.

For more information on companies in this article

Related Content

  • Multi-tasking carrier hogs spotlight at INTERMAT
    January 6, 2017
    The Multihog MH90 multi-purpose implement carrier is making its INTERMAT debut this year. Developed and manufactured in Ireland, this ground breaking all-seasonal vehicle has made strong inroads into the municipal and highway maintenance sectors due to its versatility and proven ability to improve productivity and cut costs. The Multihog can be used with an almost limitless number of attachments all year round to carry out diverse tasks such as verge and barrier maintenance, sweeping, grass and hedge cuttin
  • Multi-tasking carrier hogs spotlight at INTERMAT
    April 18, 2012
    The Multihog MH90 multi-purpose implement carrier is making its INTERMAT debut this year. Developed and manufactured in Ireland, this ground breaking all-seasonal vehicle has made strong inroads into the municipal and highway maintenance sectors due to its versatility and proven ability to improve productivity and cut costs. The Multihog can be used with an almost limitless number of attachments all year round to carry out diverse tasks such as verge and barrier maintenance, sweeping, grass and hedge cuttin
  • Major Europe-Asia bridge connection in Turkey
    July 1, 2014
    The 3rd Bosporus Bridge and the Northern Marmara Motorway will improve transport links between Europe and Asia and cut chronic congestion in Istanbul, Turkey’s largest city - Mike Woof reports Work is now well underway on the 3rd Bosporus Bridge and the Northern Marmara Motorway, providing a new link for Turkish city Istanbul and the region as a whole. This enormous bridge and highway project is breaking several records for Turkey in terms of scale, as well as setting a number of international records for e
  • M1 motorway safety benefits from transition barrier use
    December 3, 2013
    Temporary transition solutions for roadworks areas improve safety for personnel and drivers. A new temporary transition barrier system has been put to use successfully on the M1 motorway in the UK. Initial trials on the M1 have highlighted the potential cost savings and improved safety for road construction personnel and drivers on the approach to highway maintenance works. A spokesperson for BAM, Nuttall Morgan Sindall Joint Venture on the M1, junctions 39 to 42, said that the use of Asset Safe Taper syst