Skip to main content

Barrier removal

A novel use of a scrap shear has helped safety upgrades for the A14 highway linking the Italian cities of Bari and Naples. A Promove SC2200 scrap shear has been used to cut and remove old steel guard-rail on the highway.
April 5, 2012 Read time: 1 min
High speed cutting was achieved using the Promove scrap shear, allowing old barrier sections to be removed from an Italian highway
RSSA novel use of a scrap shear has helped safety upgrades for the A14 highway linking the Italian cities of Bari and Naples. A 2689 Promove SC2200 scrap shear has been used to cut and remove old steel guard-rail on the highway.

The 2.5tonne cutter was mounted on a CAT M322D wheeled excavator and was able to cut the sections extract poles and load scraps on a truck waiting just slightly ahead of the cutting zone. The operation was carried out in a single lane as the highway was not closed and traffic was diverted onto another lane.

However the operator made sure that the excavator stayed within the limitations of the working area, ensuring safety for the vehicles driving past.

The SC2200 unit worked fast and productively, allowing the full highway width to be reopened in time for heavy holiday traffic. In addition the unit's 360° hydraulic-powered rotation allowed the driver to position the shear for cutting and to safely load the cut sections onto the truck.

For more information on companies in this article

Related Content

  • German bridge demolition work assisted by Liebherr
    May 9, 2022
    Construction equipment from Liebherr has played an important role in the project to demolish a bridge in Germany.
  • Bridge demolition with breakers
    May 5, 2021
    Hydraulic breakers from Italian firm Indeco have been used successfully to carry out important work on the Princes Freeway in Australia’s Victoria State.
  • Tough competition in concrete paving market
    February 13, 2012
    One thing is clear in the concrete slipforming sector. This comparatively niche market for equipment is rapidly becoming a good deal more competitive as key manufacturers jostle for position.
  • Bertha ends her Alaskan Way voyage in Seattle
    December 21, 2017
    Seattle's State Route 99 viaduct is coming down. David Arminas was on site. Bertha, the world’s largest diameter earth pressure balance tunnel boring machine, with a cutterhead diameter of 17.5m, is no more. Her 2.7km journey underneath the waterfront area of Seattle finished on April 4 and the power went off for the last time on an extraordinary TBM that had finally completed an extraordinary job. “A small sidewalk job would have had more impact on city traffic than we have had,” says Brian Russell a v