Skip to main content

Barrier removal

A novel use of a scrap shear has helped safety upgrades for the A14 highway linking the Italian cities of Bari and Naples. A Promove SC2200 scrap shear has been used to cut and remove old steel guard-rail on the highway.
February 17, 2012 Read time: 1 min
High speed cutting was achieved using the Promove scrap shear, allowing old barrier sections to be removed from an Italian highway
A novel use of a scrap shear has helped safety upgrades for the A14 highway linking the Italian cities of Bari and Naples. A 2689 Promove SC2200 scrap shear has been used to cut and remove old steel guard-rail on the highway.

The 2.5tonne cutter was mounted on a CAT M322D wheeled excavator and was able to cut the sections extract poles and load scraps on a truck waiting just slightly ahead of the cutting zone. The operation was carried out in a single lane as the highway was not closed and traffic was diverted onto another lane.

However the operator made sure that the excavator stayed within the limitations of the working area, ensuring safety for the vehicles driving past.

The SC2200 unit worked fast and productively, allowing the full highway width to be reopened in time for heavy holiday traffic. In addition the unit's 360° hydraulic-powered rotation allowed the driver to position the shear for cutting and to safely load the cut sections onto the truck.

For more information on companies in this article

Related Content

  • Asphalt paving is seeing innovative new technology
    April 4, 2013
    With new machines coming to market, the asphalt paving sector is seeing an array of sophisticated technology now available
  • Multiple roles for compact construction machines
    February 24, 2012
    Versatility remains the key for the utility equipment sector. The range of duties that compact machines can be used for continues to grow.
  • Safety measures aid workzone accident reduction
    February 20, 2012
    Everyone connected with the highway industry is involved in the efforts to cut down the number of work zone accidents. Patrick Smith reports. A few months ago, as road work resumed on America's highways and bridges, US Transportation Secretary Ray LaHood called on drivers to use extra caution in work zones. At the same time he commended the success in reducing overall roadway fatalities in each of the last seven years.
  • Bilbao benefits from major tunnel project
    February 10, 2012
    The northern Spanish city of Bilbao looks set to benefit from a major tunnel construction project aimed at reducing traffic congestion on its vehicle clogged streets. The city is building a new underground metro section, Line 3, which will help carry commuters to and from the city's commercial centre and help reduce vehicle journey times on the surface. This project is also making use of the latest piece of tunnelling equipment from Sandvik, the MT520 roadheader, a powerful machine designed and built at