Skip to main content

Incomplete UK roadworks could number up to 25,000

There could be up to 25,000 incomplete roadworks across the UK, according to breakdown recovery firm LV Road Rescue. The estimated figure equates to around 3,862kms of roadworks. Local authorities are spending €800 million (£647 million) on roadworks. In a separate survey, two-thirds of UK motorists believe the quality of roads in their local area is getting worse and more than a third (37%) said roadworks are not completed quickly enough. It is said the road repairs backlog is around €12.78 billion (£10.5
May 13, 2014 Read time: 1 min
There could be up to 25,000 incomplete roadworks across the UK, according to breakdown recovery firm LV Road Rescue. The estimated figure equates to around 3,862kms of roadworks. Local authorities are spending €800 million (£647 million) on roadworks. In a separate survey, two-thirds of UK motorists believe the quality of roads in their local area is getting worse and more than a third (37%) said roadworks are not completed quickly enough. It is said the road repairs backlog is around €12.78 billion (£10.5 billion).

Related Content

  • Skanska to start Black Cat upgrade
    November 30, 2023
    The A428 upgrade work in England was awarded in 2021 to create a 16km dual carriageway to improve journeys between Milton Keynes, Bedford and Cambridge, near London.
  • Kenya develops annuity road funding model
    May 8, 2015
    Kenya is introducing novel methods for funding its necessary road infrastructure development - Shem Oirere writes. Kenya has unveiled a new financing model for road construction and reviewed its design standards and construction methodologies, which forms part of a new strategy for the East African country. Under this new plan Kenya is planning to upgrade 10,000km of road, with these links featuring asphalt surfacing; the work being carried out over the next five years at a cost of US$2.8 billion. Despite t
  • Montreal’s critical list of deteriorating bridges and tunnels has doubled
    September 3, 2012
    The number of Montreal’s bridges and tunnels in a “critical” condition has more than doubled during the past 12 months, says a shocking new report looking at the state of the city’s transport infrastructure. The new report, which came out this month, shows that 27 of the city’s 587 highway structures reached “critical condition” in 2011 compared with only 12 in 2010.
  • Planning road repairs efficiently
    August 21, 2015
    Limited highways maintenance budgets can deliver more with a planned asset management approach - *Will Baron. In recent years, a growing number of local and highways authorities have found themselves trapped in a vicious cycle of reactive road repairs. Several bad winters, floods and years of under-investment have taken their toll on road networks. This has led to political and public pressure to patch up potholes and make emergency repairs, ultimately diverting funds away from planned highways maintenance.