Skip to main content

Israel interchange

A new US$350 million road project by the Israel National Roads Company will boost connectivity from the north to the centre of the country. The project is seeing the opening of new interchanges and roads in western Galilee.
March 20, 2012 Read time: 3 mins
A new US$350 million road project by the 2602 Israel National Roads Company will boost connectivity from the north to the centre of the country. The project is seeing the opening of new interchanges and roads in western Galilee. The aim of the project was to double the traffic capacity on Road 77, the Hamovil and Somech junctions and road No 79 that connects them. This will improve safety and increase capacity on the road to Nazareth, the Sea of Galilee and back. The work increases the speed limit to 100km/h and reduce journey times, while delivering safe and high-quality roads for users. The work has been needed as Road No 79 is a central east-west artery connecting the Nazareth metropolis with the metropolis of Haifa. The project included construction of interchanges at the Hamovil and Somech junctions, which are among the most important of their kind in northern Israel. This project forms an integral part of the Netivei Israel plan, programme designed to boost the transportation network between the country's centre, the Negev (the south) and Galilee (the north). The work involved widening the roads by adding a lane in each direction, construction of a 120m long bridge at Hamovil interchange, construction of a three level interchange at Somech and the installation of a concrete safety barrier between lanes. The work also encompassed expanding the road shoulders, upgrading Ishai junction, landscaping works, improving junctions and construction of five mini-interchanges, the addition of bus stations and building paths for pedestrians. The new interchanges serve residents of the Jezreel valley, Sea of Galilee, Nazareth and its surroundings. Road No 77 to Hamovil interchange and Road No 79 from Hamovil interchange to Somech interchange have been expanded into two-lane roads, and the permitted driving speed was increased to 100km/h. At Somech interchange, the junction of roads No 70 and No 79 has been transformed into a rapid interchange, with a tunnel for drivers from the Galilee to Haifa on the lower level, and at its center open space of a light railway. The revsied Somech interchange also eliminates most of the traffic lights at the junction. Construction of the interchange was designed to bring forward the connection to the Cross-Israel Highway (Highway 6) when it will be continued to the north, toward the western Galilee. In its center, space was allocated for the future construction of a light railway line between the Krayot (Haifa suburbs) and Nazareth. The interchange work was carried out over the past two and a half years and included building a 100m long bridge and upgrading the major roads entering and exiting the interchange. Work was conducted with minimal interference to the heavy traffic in the area.

Related Content

  • Bentley’s Be Inspired Awards highlight innovation in software use
    January 6, 2015
    Innovation, from design to on-site execution, is alive and well, thanks to a good helping of software application. David Arminas reports from software developer Bentley’s annual global conference, held this year in London Successful project delivery is increasingly about hard men and women using software to get the job done and this year’s global conference in London by US-based software developer Bentley highlighted some innovative - and startling - examples. As usual, the Year in Infrastructure 2014
  • Stantec: coming to an infrastructure site near you
    April 13, 2017
    Acquisitive Canadian firm Stantec is snapping up more transportation expertise as it moves out of its home North American market. David Arminas reports. Last December, politicians from the US states of Kentucky and Indiana celebrated the opening of the second of two major bridges. A ribbon-cutting ceremony took place in cold wintry weather on the new 762m-long cable-stayed Lewis and Clark Bridge. The event marked the finish of the prestigious three-and-half-year Ohio River Bridges Project.
  • Cowi wins Massey Tunnel design
    July 22, 2022
    Cowi has won a contract as owner's engineer for an eight-lane replacement immersed tunnel under the Fraser River near the Pacific coast city of Vancouver. Cowi said it will draw on its experience designing the original four-lane George Massey Tunnel in 1959 and whose removal the engineering firm will later oversee.
  • Brazil’s Serra do Cafezal Highway
    July 29, 2015
    Brazil's improved Mercosur route will boost capacity and cut travel time - Mauro Nogarin writes. The Régis Bittencourt Highway is one of the main access routes of the Mercosur traffic. It has a length of 400km and connects the main cities of São Paulo and Curitiba, which allows for products to enter from the southeast toward the rest of the southern part of Brazil and later transit to Argentina, Paraguay and Uruguay. Products also flow into Brazil from Mercosur through this major highway. The cost of the hi