Skip to main content

WJ to improve Contramark system

An update is coming for the Contramark II temporary road stud installation system.
By David Arminas July 21, 2020 Read time: 2 mins
Hitting the mark: temporary tape markings with WJ’s Contramark II road safety system

UK-based road works safety specialist WJ is set to deliver this year what it says will be the first accelerated-wear testing device for road studs.

The company also said that it will be updating its Contramark II temporary road stud installation system during the year. Improvements, too, have been made to its Hydroblast line removal process and the company’s Captive Shot Retexturing equipment.

Company executives revealed their plans during a safety conference in southwest England earlier this year.

The Contramark Fully Automated Surface Applied Temporary Road Stud System consists of temporary tape markings and “stick-on” road studs.

“It is still very frustrating that there is no live test bed in the UK where we can check performance of our new ideas,” said Martin Webb, operations director at WJ. “Usually we have to go to Belgium for road trials, but this latest investment is a step change for testing road studs as well as other highway maintenance and traffic products. The equipment will be initially for our own use but ultimately made available for anyone in the highways sector to utilise as well.”

WJ has developed an LGV Driver Performance Monitoring and Reward Programme. Speeding, harsh cornering, severe braking, rapid acceleration and stop-sign violations are monitored on a system within the vehicle’s cab. From this information, WJ produces a league table for drivers in each of its depots with the top of the league receiving a cash prize every month and then again at the end of the year.

More information is available from the website of WJ.

For more information on companies in this article

Related Content

  • UK universities' research shows potholes can be fixed better
    February 14, 2013
    Academic research by two UK universities shows that patch repairs on potholes could be far more durable if a few simple techniques were consistently used. An initial study - undertaken by Nottingham Trent University and the University of Nottingham in central England– found that the application of a coat of bitumen emulsion between two layers of asphalt in a clean, dry repair, greatly improved its resistance to further cracks. It was also confirmed that a hot mix repair – in which asphalt is heated to 140°C
  • Transport Focus to sort out English road signs
    March 18, 2020
    Transport Focus is zeroing in on poorly maintained road signs in England.
  • Highways England to trial different speeds through road works
    August 6, 2018
    Highways England is trialling different speed limits through roadworks during different times in order to respond to drivers’ feedback. Highways England, the government-owned company responsible for modernising, maintaining and operating England’s motorways and major A roads, said it is acting on drivers’ frustration with roadworks. Speed through motorway roadworks could be increased depending on what day of the week they are travelling. The decision follows earlier trials to increase the speed l
  • Iterchimica trials more Gipave in Oxfordshire
    November 23, 2023
    Another trial of Iterchimica’s graphene-enhanced Gipave technology gets underway in the English county of of Oxfordshire.