Skip to main content

WJ to improve Contramark system

An update is coming for the Contramark II temporary road stud installation system.
By David Arminas July 21, 2020 Read time: 2 mins
Hitting the mark: temporary tape markings with WJ’s Contramark II road safety system

UK-based road works safety specialist WJ is set to deliver this year what it says will be the first accelerated-wear testing device for road studs.

The company also said that it will be updating its Contramark II temporary road stud installation system during the year. Improvements, too, have been made to its Hydroblast line removal process and the company’s Captive Shot Retexturing equipment.

Company executives revealed their plans during a safety conference in southwest England earlier this year.

The Contramark Fully Automated Surface Applied Temporary Road Stud System consists of temporary tape markings and “stick-on” road studs.

“It is still very frustrating that there is no live test bed in the UK where we can check performance of our new ideas,” said Martin Webb, operations director at WJ. “Usually we have to go to Belgium for road trials, but this latest investment is a step change for testing road studs as well as other highway maintenance and traffic products. The equipment will be initially for our own use but ultimately made available for anyone in the highways sector to utilise as well.”

WJ has developed an LGV Driver Performance Monitoring and Reward Programme. Speeding, harsh cornering, severe braking, rapid acceleration and stop-sign violations are monitored on a system within the vehicle’s cab. From this information, WJ produces a league table for drivers in each of its depots with the top of the league receiving a cash prize every month and then again at the end of the year.

More information is available from the website of WJ.

For more information on companies in this article

Related Content

  • Connect Plus joins Highways Agency’s plea to drivers to take care through road works
    October 30, 2013
    Connect Plus, the design, build, finance and operating company for southern England’s M25 and its adjoining trunk routes, last week joined with the Highways Agency to convey vital messages to drivers passing through road works. The company, a joint venture consisting of Balfour Beatty, Skanska, Atkins and Egis Projects SA, was participating in the Highways Agency Road Worker Safety Week (21-28 October), which aimed to get across to the public some of the dangers road workers face in their work close to fas
  • Riding the sustainable cycle
    October 5, 2020
    It’s taken a while in North America, but “vehicular cycling” has been replaced by “sustainable cycling”, says transportation engineer Tyler Golly.
  • UK’s M6 tolled motorway for sale
    June 21, 2016
    For sale: one UK toll motorway along with operating business. Well maintained. Price negotiable. David Arminas looks at what is on offer As if right on cue, a French articulated truck starts to back up along the hard shoulder at an exit area of M6toll. The manoeuvring is watched from an office inside the nearby M6toll headquarters. Inside, Andy Pearson, chief executive of M6toll, glances over his shoulder and interrupts his presentation to World Highways. “He’s probably missed the dedicated wide-load
  • HxGN Live 2014: Hexagon CEO highlights individual need to grasp IT innovation
    June 4, 2014
    Hexagon president and CEO Ola Rollén stressed how individual users of exciting information technology innovation held the key to successfully confronting growing global challenges during his keynote speech titled ‘The Disruptive Power of Transformation’ which officially opened HxGN Live 2014.