Skip to main content

WJ to improve Contramark system

An update is coming for the Contramark II temporary road stud installation system.
By David Arminas July 21, 2020 Read time: 2 mins
Hitting the mark: temporary tape markings with WJ’s Contramark II road safety system

UK-based road works safety specialist WJ is set to deliver this year what it says will be the first accelerated-wear testing device for road studs.

The company also said that it will be updating its Contramark II temporary road stud installation system during the year. Improvements, too, have been made to its Hydroblast line removal process and the company’s Captive Shot Retexturing equipment.

Company executives revealed their plans during a safety conference in southwest England earlier this year.

The Contramark Fully Automated Surface Applied Temporary Road Stud System consists of temporary tape markings and “stick-on” road studs.

“It is still very frustrating that there is no live test bed in the UK where we can check performance of our new ideas,” said Martin Webb, operations director at WJ. “Usually we have to go to Belgium for road trials, but this latest investment is a step change for testing road studs as well as other highway maintenance and traffic products. The equipment will be initially for our own use but ultimately made available for anyone in the highways sector to utilise as well.”

WJ has developed an LGV Driver Performance Monitoring and Reward Programme. Speeding, harsh cornering, severe braking, rapid acceleration and stop-sign violations are monitored on a system within the vehicle’s cab. From this information, WJ produces a league table for drivers in each of its depots with the top of the league receiving a cash prize every month and then again at the end of the year.

More information is available from the website of WJ.

For more information on companies in this article

Related Content

  • Bridges in Sunderland and Poland are being slid into place
    February 6, 2017
    Sunderland sees a bridge slide into place and two bridges inch their way across a Polish highway Slowly but surely, a 2,500 tonne section of a new bridge deck was eased out from the banks of the River Wear near Sunderland in northern England. It now straddles the water, pointing towards the opposite bank which it will eventually reach after another sliding operation likely to take place next year. The project to build the New Wear Crossing is now halfway through with the first half of the steel deck b
  • Case's first European Rodeo
    February 8, 2012
    Construction equipment manufacturer Case put dozens of its operator customers through their paces at a first-ever European Rodeo event to mark the first anniversary of the opening of its Customer Centre in Paris.
  • Hire equipment exhibition in the UK
    November 23, 2021
    The construction hire equipment exhibition will be in the UK.
  • Ringway wins Highways England southwest maintenance-response deal
    April 12, 2017
    Ringway, part of Eurovia UK, won the Highways England southwest area Maintenance and response contract. The 15-year term starts 1 July and is worth between nearly €18-35 million a year. Ringway will be responsible for maintenance of 1,695km of strategic road network within the counties of Cornwall, Devon, Somerset, Dorset, Wiltshire and Gloucestershire. This includes all cyclic maintenance, reactive maintenance, incident response, severe weather response and associated traffic management. “This is