Skip to main content

UK’s M3 motorway gets first orange emergency area

The first of a new-style smart motorway emergency stop area is being trialled on the M3 in England. The redesigned emergency area has a highly visible orange road surface and better signs to improve its visibility, according to Highways England, the wholly government-owned company responsible for modernising, maintaining and operating England’s motorways and major A roads.
August 1, 2017 Read time: 2 mins
Safer with an orange: Emergency Refuge Areas using QMS Type 1 HyperGrip system

The first of a new-style smart motorway emergency stop area is being trialled on the M3 in England.

The redesigned emergency area has a highly visible orange road surface and better signs to improve its visibility, according to 8100 Highways England, the wholly government-owned company responsible for modernising, maintaining and operating England’s motorways and major A roads.

Work on the officially-called Emergency Refuge Areas is being done by 8037 WJ in collaboration with maintenance contractors 1146 Balfour Beatty and 184 Colas.

Smart motorways relieve congestion and improve journey times by making the hard shoulder available for use at busy periods. On some schemes, it is permanently converted into a traffic lane, known as All Lane Running.

Spaced emergency refuge areas - ERA - are provided roughly every 2.5km and are clearly marked with blue signs featuring an orange SOS telephone symbol.

This safety upgrade, using QMS Type 1 HyperGrip system, has been delivered on the 21.5km smart motorway scheme, which covers the M3 from junctions 2-4a in Hampshire and Surrey counties. Two emergency refuge areas were completed as z trial and now all ERA’s on the scheme will be afforded the same enhancement.

It is planned now to apply this coloured system on all ERA’s throughout the scheme with other smart motorway contracts expressing interest.

The change is part of an ongoing review into the design and spacing of emergency areas on smart motorways, said Jim O’Sullivan, Highways England chief executive.

Quality Marking Services
%$Linker: 2 External <?xml version="1.0" encoding="utf-16"?><dictionary /> 0 0 0 oLinkExternal www.qmarkings.co.uk Quality Marking Services Website Link false http://www.qmarkings.co.uk/ false false%>

For more information on companies in this article

Related Content

  • Dynapac is now offering new emission compliant soil compactors
    April 11, 2012
    Dynapac says that its new fifth generation CA single drum vibratory rollers, the CA5000, CA6000 and CA6500, offer performance upgrades over other machines. These machines have transverse-mounted engines that improve serviceability as well as optimised amplitude to boost compaction performance. A novel Active Bouncing Control is said to prevent damage to the machines as well over-compaction. High comfort cabs, good manoeuvrability and reduced noise levels and fuel consumption all help to make these machines
  • Fassi offers novel crane technology
    January 6, 2017
    Fassi Gru is launching its novel F120B and F125A cranes, which follow the F110B model launched in 2012. These new machines feature a system with one or two lifting links that improve performance and efficiency. In the case of the F125A, a sophisticated, automatic dynamic control is also fitted. Meanwhile the F1950RAL+L816 crane now offers the largest reach ever developed by Fassi. The company’s products also benefit from advanced electronics and the use of high and ultra-high strength steels, while Fassi Gr
  • Fassi offers novel crane technology
    January 31, 2013
    Fassi Gru is launching its novel F120B and F125A cranes, which follow the F110B model launched in 2012. These new machines feature a system with one or two lifting links that improve performance and efficiency. In the case of the F125A, a sophisticated, automatic dynamic control is also fitted. Meanwhile the F1950RAL+L816 crane now offers the largest reach ever developed by Fassi. The company’s products also benefit from advanced electronics and the use of high and ultra-high strength steels, while Fassi Gr
  • Algeria to engage Japanese government over dispute with Cojaal
    January 14, 2015
    The Algerian government is now talking directly to the Japanese government in an effort to resolve a dispute with sacked Japanese highways consortium Cojaal, In 2006, Cojaal won a US$5 billion deal to build the 359km eastern section of Algeria’s proposed 900km East-West Highway within 40 months. Algeria divided the contract into three sections, with the Chinese company Citic-CRCC winning the central and western sections, which in total was to cost around $6 billion.