Skip to main content

UK’s M3 motorway gets first orange emergency area

The first of a new-style smart motorway emergency stop area is being trialled on the M3 in England. The redesigned emergency area has a highly visible orange road surface and better signs to improve its visibility, according to Highways England, the wholly government-owned company responsible for modernising, maintaining and operating England’s motorways and major A roads.
August 1, 2017 Read time: 2 mins
Safer with an orange: Emergency Refuge Areas using QMS Type 1 HyperGrip system

The first of a new-style smart motorway emergency stop area is being trialled on the M3 in England.

The redesigned emergency area has a highly visible orange road surface and better signs to improve its visibility, according to 8100 Highways England, the wholly government-owned company responsible for modernising, maintaining and operating England’s motorways and major A roads.

Work on the officially-called Emergency Refuge Areas is being done by 8037 WJ in collaboration with maintenance contractors 1146 Balfour Beatty and 184 Colas.

Smart motorways relieve congestion and improve journey times by making the hard shoulder available for use at busy periods. On some schemes, it is permanently converted into a traffic lane, known as All Lane Running.

Spaced emergency refuge areas - ERA - are provided roughly every 2.5km and are clearly marked with blue signs featuring an orange SOS telephone symbol.

This safety upgrade, using QMS Type 1 HyperGrip system, has been delivered on the 21.5km smart motorway scheme, which covers the M3 from junctions 2-4a in Hampshire and Surrey counties. Two emergency refuge areas were completed as z trial and now all ERA’s on the scheme will be afforded the same enhancement.

It is planned now to apply this coloured system on all ERA’s throughout the scheme with other smart motorway contracts expressing interest.

The change is part of an ongoing review into the design and spacing of emergency areas on smart motorways, said Jim O’Sullivan, Highways England chief executive.

Quality Marking Services
%$Linker: 2 External <?xml version="1.0" encoding="utf-16"?><dictionary /> 0 0 0 oLinkExternal www.qmarkings.co.uk Quality Marking Services Website Link false http://www.qmarkings.co.uk/ false false%>

For more information on companies in this article

Related Content

  • BLS Enterprises is offering new milling machine trackpads
    April 11, 2013
    Component specialist BLS Enterprises is offering a durable replacement track pad for use on Wirtgen milling machines. President Barry Stoughton said, “We have a direct replacement for the EPS system.” He said that this two part pad system allows the pad to bolt directly onto the track. Long life and durability are claimed, as well as ease of replacement.
  • Komatsu adds WA470 to its Dash-7 wheel loader range
    April 18, 2013
    Komatsu has unveiled its 23,590kg operating weight WA470-7 wheel loader, which offers improved efficiency, lower fuel consumption, improved operator comfort and enhanced serviceability. It is powered by a 203kW Stage IIIB/ EPA Tier 4I Komatsu SAA6D125E-6 engine, which is said to lower fuel consumption by 10% to 15% compared with the WA470-6. The engine is fitted with EGR, a hydraulically-actuated variable geometry turbocharger, and an automatically regenerating DPF. As with all Komatsu Stage IIIB machines,
  • Tenders open for England’s A66 northern trans-Pennine route
    October 31, 2019
    A €52 million contract to design the transformation of the A66 northern trans-Pennine route in England is now up for grabs, according to Highways England. A tender is open for dualling the remaining single carriageway sections of the A66 which links the M6 motorway at Penrith in Cumbria and the A1(M) motorway) at Scotch Corner in North Yorkshire. The formal notice for the A66 Preliminary Designer, Construction Technical Advisor and Supervision tender process has been published in the Official Journal of
  • High court drama expected at Highways UK event, NEC, Birmingham
    November 7, 2016
    What happens when a highways services employee is prosecuted for failing to follow established safety procedures? How would a courtroom drama unfold for the accused and the employer?