Skip to main content

UK’s M3 motorway gets first orange emergency area

The first of a new-style smart motorway emergency stop area is being trialled on the M3 in England. The redesigned emergency area has a highly visible orange road surface and better signs to improve its visibility, according to Highways England, the wholly government-owned company responsible for modernising, maintaining and operating England’s motorways and major A roads.
August 1, 2017 Read time: 2 mins
Safer with an orange: Emergency Refuge Areas using QMS Type 1 HyperGrip system

The first of a new-style smart motorway emergency stop area is being trialled on the M3 in England.

The redesigned emergency area has a highly visible orange road surface and better signs to improve its visibility, according to 8100 Highways England, the wholly government-owned company responsible for modernising, maintaining and operating England’s motorways and major A roads.

Work on the officially-called Emergency Refuge Areas is being done by 8037 WJ in collaboration with maintenance contractors 1146 Balfour Beatty and 184 Colas.

Smart motorways relieve congestion and improve journey times by making the hard shoulder available for use at busy periods. On some schemes, it is permanently converted into a traffic lane, known as All Lane Running.

Spaced emergency refuge areas - ERA - are provided roughly every 2.5km and are clearly marked with blue signs featuring an orange SOS telephone symbol.

This safety upgrade, using QMS Type 1 HyperGrip system, has been delivered on the 21.5km smart motorway scheme, which covers the M3 from junctions 2-4a in Hampshire and Surrey counties. Two emergency refuge areas were completed as z trial and now all ERA’s on the scheme will be afforded the same enhancement.

It is planned now to apply this coloured system on all ERA’s throughout the scheme with other smart motorway contracts expressing interest.

The change is part of an ongoing review into the design and spacing of emergency areas on smart motorways, said Jim O’Sullivan, Highways England chief executive.

Quality Marking Services
%$Linker: 2 External <?xml version="1.0" encoding="utf-16"?><dictionary /> 0 0 0 oLinkExternal www.qmarkings.co.uk Quality Marking Services Website Link false http://www.qmarkings.co.uk/ false false%>

For more information on companies in this article

Related Content

  • Double delight for Powerscreen and DUO in Ghana
    April 16, 2013
    Powerscreen has signed DUO Africa as its first distributor in Ghana. And, as the ink dried on the contract at bauma, the company unveiled a deal to supply three crushing and screening trains. DUO Africa will sell equipment into Ghana and support Powerscreen products in the sub-Saharan region. Among its first contracts is to supply two Powerscreen XA400 primary jaw crushers, two 1000 Maxtrak cone crushers and two Chieftain 2100 triple-deck screens to UK-based Hawk Plant for a number of aggregate crushing ope
  • Soilmec shows SC-70 and SC-90 hydraulic crawler cranes
    January 6, 2017
    Models brought to bauma by Soilmec included two new multipurpose hydraulic crawler cranes for heavy-duty applications. Among key features of the SC-70 and SC-90 is a design that enables easy transport and set-up on site. The cranes are modular for fast conversion between a range of applications, such as use with a hydraulic or mechanical grab, hydromill, chisel, vibratory driver or clamshell. New Tier 4 engines are available.
  • Soilmec shows SC-70 and SC-90 hydraulic crawler cranes
    April 19, 2013
    Models brought to bauma by Soilmec included two new multipurpose hydraulic crawler cranes for heavy-duty applications. Among key features of the SC-70 and SC-90 is a design that enables easy transport and set-up on site. The cranes are modular for fast conversion between a range of applications, such as use with a hydraulic or mechanical grab, hydromill, chisel, vibratory driver or clamshell. New Tier 4 engines are available.
  • NDT sensor fusion in structural pavement condition surveys
    February 27, 2017
    Early detection of pavement defects and the causes of deterioration is essential for effective maintenance planning, writes Dr Alena Uus* There is a need for optimisation and development of UK highway survey methods that would provide comprehensive information on the surface and subsurface pavement condition and operate at traffic speed, which eliminates the requirement for lane closures. Performance of non-destructive testing (NDT) methods commonly employed in pavement condition surveys can be potent