Skip to main content

UK’s M3 motorway gets first orange emergency area

The first of a new-style smart motorway emergency stop area is being trialled on the M3 in England. The redesigned emergency area has a highly visible orange road surface and better signs to improve its visibility, according to Highways England, the wholly government-owned company responsible for modernising, maintaining and operating England’s motorways and major A roads.
August 1, 2017 Read time: 2 mins
Safer with an orange: Emergency Refuge Areas using QMS Type 1 HyperGrip system

The first of a new-style smart motorway emergency stop area is being trialled on the M3 in England.

The redesigned emergency area has a highly visible orange road surface and better signs to improve its visibility, according to 8100 Highways England, the wholly government-owned company responsible for modernising, maintaining and operating England’s motorways and major A roads.

Work on the officially-called Emergency Refuge Areas is being done by 8037 WJ in collaboration with maintenance contractors 1146 Balfour Beatty and 184 Colas.

Smart motorways relieve congestion and improve journey times by making the hard shoulder available for use at busy periods. On some schemes, it is permanently converted into a traffic lane, known as All Lane Running.

Spaced emergency refuge areas - ERA - are provided roughly every 2.5km and are clearly marked with blue signs featuring an orange SOS telephone symbol.

This safety upgrade, using QMS Type 1 HyperGrip system, has been delivered on the 21.5km smart motorway scheme, which covers the M3 from junctions 2-4a in Hampshire and Surrey counties. Two emergency refuge areas were completed as z trial and now all ERA’s on the scheme will be afforded the same enhancement.

It is planned now to apply this coloured system on all ERA’s throughout the scheme with other smart motorway contracts expressing interest.

The change is part of an ongoing review into the design and spacing of emergency areas on smart motorways, said Jim O’Sullivan, Highways England chief executive.

Quality Marking Services
%$Linker: 2 External <?xml version="1.0" encoding="utf-16"?><dictionary /> 0 0 0 oLinkExternal www.qmarkings.co.uk Quality Marking Services Website Link false http://www.qmarkings.co.uk/ false false%>

For more information on companies in this article

Related Content

  • Boom time at JLG
    January 6, 2017
    Unveiled as a prototype at SAIE, Italy in October 2010, the compact 340AJ boom lift can cope with grades and break-over angles up to 45° allowing it to drive on slopes and up ramps. Built to a working height of 12.35metres and with a horizontal outreach of 6.07metres, the 340AJ is said by JLG to meet demands for a broad range of applications. The jib extends to 1.2metres with near vertical operation. When ground conditions get tough, proper off-road performance is ensured by the standard oscillating axle an
  • Boom time at JLG
    April 12, 2012
    Unveiled as a prototype at SAIE, Italy in October 2010, the compact 340AJ boom lift can cope with grades and break-over angles up to 45° allowing it to drive on slopes and up ramps. Built to a working height of 12.35metres and with a horizontal outreach of 6.07metres, the 340AJ is said by JLG to meet demands for a broad range of applications. The jib extends to 1.2metres with near vertical operation. When ground conditions get tough, proper off-road performance is ensured by the standard oscillating axle an
  • Manitou will launch three revised MT telehandlers with lift heights of 8-30m
    January 6, 2017
    Though keeping exact specification under wraps until the show, Manitou will unveil the first three models in a revised MT line-up of telescopic handlers. The Stage IIIB machines will offer lift heights of 8-30m, and will focus on ease of use for the operator.
  • Manitou will launch three revised MT telehandlers with lift heights of 8-30m
    February 8, 2013
    Though keeping exact specification under wraps until the show, Manitou will unveil the first three models in a revised MT line-up of telescopic handlers. The Stage IIIB machines will offer lift heights of 8-30m, and will focus on ease of use for the operator.