Skip to main content

UK’s M3 motorway gets first orange emergency area

The first of a new-style smart motorway emergency stop area is being trialled on the M3 in England. The redesigned emergency area has a highly visible orange road surface and better signs to improve its visibility, according to Highways England, the wholly government-owned company responsible for modernising, maintaining and operating England’s motorways and major A roads.
August 1, 2017 Read time: 2 mins
Safer with an orange: Emergency Refuge Areas using QMS Type 1 HyperGrip system

The first of a new-style smart motorway emergency stop area is being trialled on the M3 in England.

The redesigned emergency area has a highly visible orange road surface and better signs to improve its visibility, according to 8100 Highways England, the wholly government-owned company responsible for modernising, maintaining and operating England’s motorways and major A roads.

Work on the officially-called Emergency Refuge Areas is being done by 8037 WJ in collaboration with maintenance contractors 1146 Balfour Beatty and 184 Colas.

Smart motorways relieve congestion and improve journey times by making the hard shoulder available for use at busy periods. On some schemes, it is permanently converted into a traffic lane, known as All Lane Running.

Spaced emergency refuge areas - ERA - are provided roughly every 2.5km and are clearly marked with blue signs featuring an orange SOS telephone symbol.

This safety upgrade, using QMS Type 1 HyperGrip system, has been delivered on the 21.5km smart motorway scheme, which covers the M3 from junctions 2-4a in Hampshire and Surrey counties. Two emergency refuge areas were completed as z trial and now all ERA’s on the scheme will be afforded the same enhancement.

It is planned now to apply this coloured system on all ERA’s throughout the scheme with other smart motorway contracts expressing interest.

The change is part of an ongoing review into the design and spacing of emergency areas on smart motorways, said Jim O’Sullivan, Highways England chief executive.

Quality Marking Services
%$Linker: 2 External <?xml version="1.0" encoding="utf-16"?><dictionary /> 0 0 0 oLinkExternal www.qmarkings.co.uk Quality Marking Services Website Link false http://www.qmarkings.co.uk/ false false%>

For more information on companies in this article

Related Content

  • Terex is introducing versatile skid steer and compact loaders
    January 6, 2017
    New highly versatile skid steer loaders and compact loaders are being introduced by Terex. The Terex TSR60 skid steer loader offers a rated capacity of 680kg and is powered by the latest, low emission engine technology that meets Tier 4 Interim/Stage IIIB requirements. Also new from the firm is the largest machine in the compact wheel loader range, the TL120. And this also is driven by low emission engine technology that meets Tier 4 Interim/Stage IIIB requirements. Both of these new machines offer more pow
  • German mining equipment sales reach record high
    January 6, 2017
    The German mining machinery market is at a record high, according to the German Engineering Federation, VDMA. Mining machinery manufacturers based in Germany hardly suffered from the financial crisis, said VDMA president Dr Thomas Lindner. Since 2007, their annual turnover has grown by about 13% on average. In 2011, growth was nearly 27% and turnover then increased by another 28% in 2012 to reach €6.2bn.
  • German mining equipment sales reach record high
    April 16, 2013
    The German mining machinery market is at a record high, according to the German Engineering Federation, VDMA. Mining machinery manufacturers based in Germany hardly suffered from the financial crisis, said VDMA president Dr Thomas Lindner. Since 2007, their annual turnover has grown by about 13% on average. In 2011, growth was nearly 27% and turnover then increased by another 28% in 2012 to reach €6.2bn.
  • CNH is investing in a new construction equipment factory in Brazil
    January 6, 2017
    CNH is planning to build a new factory at Minais Gerais in Brazil in an investment worth some US$341.4 million (R$600 million). The factory will be located in Montes Claros, in the northern part of Minas Gerais.