Skip to main content

UK’s M3 motorway gets first orange emergency area

The first of a new-style smart motorway emergency stop area is being trialled on the M3 in England. The redesigned emergency area has a highly visible orange road surface and better signs to improve its visibility, according to Highways England, the wholly government-owned company responsible for modernising, maintaining and operating England’s motorways and major A roads.
August 1, 2017 Read time: 2 mins
Safer with an orange: Emergency Refuge Areas using QMS Type 1 HyperGrip system

The first of a new-style smart motorway emergency stop area is being trialled on the M3 in England.

The redesigned emergency area has a highly visible orange road surface and better signs to improve its visibility, according to 8100 Highways England, the wholly government-owned company responsible for modernising, maintaining and operating England’s motorways and major A roads.

Work on the officially-called Emergency Refuge Areas is being done by 8037 WJ in collaboration with maintenance contractors 1146 Balfour Beatty and 184 Colas.

Smart motorways relieve congestion and improve journey times by making the hard shoulder available for use at busy periods. On some schemes, it is permanently converted into a traffic lane, known as All Lane Running.

Spaced emergency refuge areas - ERA - are provided roughly every 2.5km and are clearly marked with blue signs featuring an orange SOS telephone symbol.

This safety upgrade, using QMS Type 1 HyperGrip system, has been delivered on the 21.5km smart motorway scheme, which covers the M3 from junctions 2-4a in Hampshire and Surrey counties. Two emergency refuge areas were completed as z trial and now all ERA’s on the scheme will be afforded the same enhancement.

It is planned now to apply this coloured system on all ERA’s throughout the scheme with other smart motorway contracts expressing interest.

The change is part of an ongoing review into the design and spacing of emergency areas on smart motorways, said Jim O’Sullivan, Highways England chief executive.

Quality Marking Services
%$Linker: 2 External <?xml version="1.0" encoding="utf-16"?><dictionary /> 0 0 0 oLinkExternal www.qmarkings.co.uk Quality Marking Services Website Link false http://www.qmarkings.co.uk/ false false%>

For more information on companies in this article

Related Content

  • Wirtgen Group launches WITOS intelligent telematics system
    January 6, 2017
    The Wirtgen Group is presenting a glimpse of the future of road construction at this year's bauma. Wirtgen Group telematics and on-site solutions (WITOS) combines a telematics fleet management solution with a high-performance software system for process optimisation. WITOS is a modular software system that supports fleet and service management but also enables new approaches to process optimisation. This makes it possible to apply the just-in-time principle to organising construction processes and to optimi
  • Wirtgen Group launches WITOS intelligent telematics system
    April 16, 2013
    The Wirtgen Group is presenting a glimpse of the future of road construction at this year's bauma. Wirtgen Group telematics and on-site solutions (WITOS) combines a telematics fleet management solution with a high-performance software system for process optimisation. WITOS is a modular software system that supports fleet and service management but also enables new approaches to process optimisation. This makes it possible to apply the just-in-time principle to organising construction processes and to optimi
  • Demolition of Seattle’s Alaskan Way Viaduct has started
    February 28, 2019
    Demolition has started on downtown Seattle’s old Alaskan Way Viaduct as part of a major waterfront redevelopment project that included the State Route 99 tunnel. According to Seattle media, Washington state is aiming to collect US$200 million in tolls from the 3.2km tunnel – which is now open - as part of the $3.3 billion replacement of the Alaskan Way Viaduct. However, tolling on the double-deck tunnel which has two lanes in each direction, plus an eight-foot safety shoulder, will not start until this s
  • Two new rough terrain cranes and a new MLC165 lattice-boom crawler crane from Manitowoc
    January 6, 2017
    Manitowoc will unwrap two new Grove rough-terrain cranes at Bauma: the RT550E and RT770E, as well as a new lattice-boom crawler crane. The 45tonne capacity RT550E offers the highest and longest boom in its class at 39m and, with a chassis length of just under 12m, a width of 2.55m and an operating weight of 29tonnes, the new machine is a compact crane that can run well within most national European road regulations for heavy machinery says Manitowoc. The RT550E also features the manufacturer’s new crane con