Skip to main content

UK’s M3 motorway gets first orange emergency area

The first of a new-style smart motorway emergency stop area is being trialled on the M3 in England. The redesigned emergency area has a highly visible orange road surface and better signs to improve its visibility, according to Highways England, the wholly government-owned company responsible for modernising, maintaining and operating England’s motorways and major A roads.
August 1, 2017 Read time: 2 mins
Safer with an orange: Emergency Refuge Areas using QMS Type 1 HyperGrip system

The first of a new-style smart motorway emergency stop area is being trialled on the M3 in England.

The redesigned emergency area has a highly visible orange road surface and better signs to improve its visibility, according to 8100 Highways England, the wholly government-owned company responsible for modernising, maintaining and operating England’s motorways and major A roads.

Work on the officially-called Emergency Refuge Areas is being done by 8037 WJ in collaboration with maintenance contractors 1146 Balfour Beatty and 184 Colas.

Smart motorways relieve congestion and improve journey times by making the hard shoulder available for use at busy periods. On some schemes, it is permanently converted into a traffic lane, known as All Lane Running.

Spaced emergency refuge areas - ERA - are provided roughly every 2.5km and are clearly marked with blue signs featuring an orange SOS telephone symbol.

This safety upgrade, using QMS Type 1 HyperGrip system, has been delivered on the 21.5km smart motorway scheme, which covers the M3 from junctions 2-4a in Hampshire and Surrey counties. Two emergency refuge areas were completed as z trial and now all ERA’s on the scheme will be afforded the same enhancement.

It is planned now to apply this coloured system on all ERA’s throughout the scheme with other smart motorway contracts expressing interest.

The change is part of an ongoing review into the design and spacing of emergency areas on smart motorways, said Jim O’Sullivan, Highways England chief executive.

Quality Marking Services
%$Linker: 2 External <?xml version="1.0" encoding="utf-16"?><dictionary /> 0 0 0 oLinkExternal www.qmarkings.co.uk Quality Marking Services Website Link false http://www.qmarkings.co.uk/ false false%>

For more information on companies in this article

Related Content

  • Shantui and Manitowoc agree joint venture to manufacture cranes in China
    January 28, 2013
    Manitowoc Cranes and Shantui Investment intend to form a new joint venture. This will build mobile cranes in China for both domestic and export markets. The name of the joint venture will be Shantui Manitowoc Crane Company, and it will commence operations once all relevant approvals are received. Within China, the cranes produced by the joint venture will be sold through Shantui’s vast domestic dealer network, in addition to Manitowoc’s own dealer network for truck cranes. The joint venture and this distrib
  • Putzmeister’s new self-propelled pump can be quicker than a truck mount
    January 6, 2017
    Putzmeister’s new BSC 1409 D self-propelled concrete pump is designed for concreting drilled piles on unfinished surfaces and can deliver up to 85m3/hr at a pressure of up to 71bar. Powered by a 6-cylinder Deutz engine producing 129kW, the BSC 1409 D can travel at a maximum speed of 3.6km and does not need supports to be set up each time it moves.
  • Putzmeister’s new self-propelled pump can be quicker than a truck mount
    April 19, 2012
    Putzmeister’s new BSC 1409 D self-propelled concrete pump is designed for concreting drilled piles on unfinished surfaces and can deliver up to 85m3/hr at a pressure of up to 71bar. Powered by a 6-cylinder Deutz engine producing 129kW, the BSC 1409 D can travel at a maximum speed of 3.6km and does not need supports to be set up each time it moves.
  • Lintec showcases redesigned CSD 1500 plant at bauma
    February 12, 2013
    Especially redesigned to allow hot and cold recycling, Lintec will be showcasing its new CSD 1500 asphalt mixing plant at bauma. With a capacity of 120 tonnes/hour, the new CSD 1500 enables the integration of a hot storage silo with a 50tonne capacity. Similar to all Lintec’s CSD line plants, the aggregates enter the screen drum through the front wall.