Skip to main content

UK’s M3 motorway gets first orange emergency area

The first of a new-style smart motorway emergency stop area is being trialled on the M3 in England. The redesigned emergency area has a highly visible orange road surface and better signs to improve its visibility, according to Highways England, the wholly government-owned company responsible for modernising, maintaining and operating England’s motorways and major A roads.
August 1, 2017 Read time: 2 mins
Safer with an orange: Emergency Refuge Areas using QMS Type 1 HyperGrip system

The first of a new-style smart motorway emergency stop area is being trialled on the M3 in England.

The redesigned emergency area has a highly visible orange road surface and better signs to improve its visibility, according to 8100 Highways England, the wholly government-owned company responsible for modernising, maintaining and operating England’s motorways and major A roads.

Work on the officially-called Emergency Refuge Areas is being done by 8037 WJ in collaboration with maintenance contractors 1146 Balfour Beatty and 184 Colas.

Smart motorways relieve congestion and improve journey times by making the hard shoulder available for use at busy periods. On some schemes, it is permanently converted into a traffic lane, known as All Lane Running.

Spaced emergency refuge areas - ERA - are provided roughly every 2.5km and are clearly marked with blue signs featuring an orange SOS telephone symbol.

This safety upgrade, using QMS Type 1 HyperGrip system, has been delivered on the 21.5km smart motorway scheme, which covers the M3 from junctions 2-4a in Hampshire and Surrey counties. Two emergency refuge areas were completed as z trial and now all ERA’s on the scheme will be afforded the same enhancement.

It is planned now to apply this coloured system on all ERA’s throughout the scheme with other smart motorway contracts expressing interest.

The change is part of an ongoing review into the design and spacing of emergency areas on smart motorways, said Jim O’Sullivan, Highways England chief executive.

Quality Marking Services
%$Linker: 2 External <?xml version="1.0" encoding="utf-16"?><dictionary /> 0 0 0 oLinkExternal www.qmarkings.co.uk Quality Marking Services Website Link false http://www.qmarkings.co.uk/ false false%>

For more information on companies in this article

Related Content

  • Manitou Group aims to double business over next 3-4 years
    January 6, 2017
    Manitou Group (MG) president Jean-Christophe Giroux says the Group will look to double its business in the next three to four years after revenue rose by 35% to US$1.13billion in 2011. Speaking on the publication of details of MG’s FY11 performance Giroux, who is also the French construction, industry and agricultural machinery
  • Manitou Group aims to double business over next 3-4 years
    March 16, 2012
    Manitou Group (MG) president Jean-Christophe Giroux says the Group will look to double its business in the next three to four years after revenue rose by 35% to US$1.13billion in 2011. Speaking on the publication of details of MG’s FY11 performance Giroux, who is also the French construction, industry and agricultural machinery
  • Tackling winter maintenance
    February 9, 2012
    Winter weather often brings traffic chaos, and authorities have to be ready to tackle it as Patrick Smith reports Good winter maintenance is rarely noticed, and it is only when things go wrong that it becomes a public issue. "When sudden bouts of cold weather bring traffic chaos, icy roads receive high-profile coverage and local authorities are criticised, often unfairly, for not affording greater protection," says the Highways Term Maintenance Association (HTMA), the UK's top trade body for road mainten
  • England’s A14 project River Great Ouse Viaduct completed
    February 28, 2019
    Construction of the biggest bridge in Highways England’s €1.73 billion A14 Cambridge-to-Huntingdon upgrade has been completed. The River Great Ouse Viaduct stretches for 0.8km and when opened to traffic next year will take the new A14 road over the floodplain and the East Coast Mainline Railway line. Work began in November 2016 on the bridge that is part of a new 27.4km bypass under construction to the south of Huntingdon and away from the existing A14. The road is being widened to three lanes in both