Skip to main content

UK’s M3 motorway gets first orange emergency area

The first of a new-style smart motorway emergency stop area is being trialled on the M3 in England. The redesigned emergency area has a highly visible orange road surface and better signs to improve its visibility, according to Highways England, the wholly government-owned company responsible for modernising, maintaining and operating England’s motorways and major A roads.
August 1, 2017 Read time: 2 mins
Safer with an orange: Emergency Refuge Areas using QMS Type 1 HyperGrip system

The first of a new-style smart motorway emergency stop area is being trialled on the M3 in England.

The redesigned emergency area has a highly visible orange road surface and better signs to improve its visibility, according to 8100 Highways England, the wholly government-owned company responsible for modernising, maintaining and operating England’s motorways and major A roads.

Work on the officially-called Emergency Refuge Areas is being done by 8037 WJ in collaboration with maintenance contractors 1146 Balfour Beatty and 184 Colas.

Smart motorways relieve congestion and improve journey times by making the hard shoulder available for use at busy periods. On some schemes, it is permanently converted into a traffic lane, known as All Lane Running.

Spaced emergency refuge areas - ERA - are provided roughly every 2.5km and are clearly marked with blue signs featuring an orange SOS telephone symbol.

This safety upgrade, using QMS Type 1 HyperGrip system, has been delivered on the 21.5km smart motorway scheme, which covers the M3 from junctions 2-4a in Hampshire and Surrey counties. Two emergency refuge areas were completed as z trial and now all ERA’s on the scheme will be afforded the same enhancement.

It is planned now to apply this coloured system on all ERA’s throughout the scheme with other smart motorway contracts expressing interest.

The change is part of an ongoing review into the design and spacing of emergency areas on smart motorways, said Jim O’Sullivan, Highways England chief executive.

Quality Marking Services
%$Linker: 2 External <?xml version="1.0" encoding="utf-16"?><dictionary /> 0 0 0 oLinkExternal www.qmarkings.co.uk Quality Marking Services Website Link false http://www.qmarkings.co.uk/ false false%>

For more information on companies in this article

Related Content

  • BLS showcases its trackpad systems
    January 6, 2017
    Trackpads made by BLS Enterprises for use on Wirtgen milling machines have had their first bauma outing. Component specialist BLS Enterprises is offering a durable replacement track that is a direct replacement for the EPS system. Its distinctive range of blue-coloured pads has been developed to last 15% to 30% longer than conventional polyurethane units. “We want to be known as the people who make the blue pads,” said BLS president Barry Stoughton. Blue pads are the longest-lasting pads, he said. The two-p
  • BLS showcases its trackpad systems
    April 19, 2013
    Trackpads made by BLS Enterprises for use on Wirtgen milling machines have had their first bauma outing. Component specialist BLS Enterprises is offering a durable replacement track that is a direct replacement for the EPS system. Its distinctive range of blue-coloured pads has been developed to last 15% to 30% longer than conventional polyurethane units. “We want to be known as the people who make the blue pads,” said BLS president Barry Stoughton. Blue pads are the longest-lasting pads, he said. The two-p
  • Lintec presents new Gussasphalt plant for the European Market
    January 6, 2017
    German company Lintec will present for the first time its specially designed and fully containerised Gussasphalt plant for the European Market, the CDD 1200 GA. The plant has a capacity of 20tonnes of Gussasphalt per hour (optional up to 20tonnes/hour), and was sold to the French company SMAC (belonging to the Colas Group) and will operate in the west of France near Rennes. The plant has a hot bin with one chamber and can take 15tonnes of material while the recuperated filler silo is 11tonnes and one or tw
  • Lintec presents new Gussasphalt plant for the European Market
    April 12, 2012
    German company Lintec will present for the first time its specially designed and fully containerised Gussasphalt plant for the European Market, the CDD 1200 GA. The plant has a capacity of 20tonnes of Gussasphalt per hour (optional up to 20tonnes/hour), and was sold to the French company SMAC (belonging to the Colas Group) and will operate in the west of France near Rennes. The plant has a hot bin with one chamber and can take 15tonnes of material while the recuperated filler silo is 11tonnes and one or tw