Skip to main content

Tertu’s T40 guardrail passes Chinese certification

Tertu reports that its T40 guardrail is the first European steel-backed timber safety barrier to be certified to Chinese standard JTG B05-01 -2013 (level A) The T40 barrier recently passed a crash-test programme at the Beijing Shenhuada laboratory. This certification is an essential step for the development of the company’s business in China, according to the French manufacturer, which will be at Intertraffic in Amsterdam this month. The barrier system consists of two half-logs 22cm in diameter and ei
April 19, 2018 Read time: 2 mins
A Beijing bus stop: Tertu’s T40 guardrail recently stood up to a 10-tonne Chinese bus during certification tests
7825 Tertu reports that its T40 guardrail is the first European steel-backed timber safety barrier to be certified to Chinese standard JTG B05-01 -2013 (level A)


The T40 barrier recently passed a crash-test programme at the Beijing Shenhuada laboratory. This certification is an essential step for the development of the company’s business in China, according to the French manufacturer, which will be at 244 Intertraffic in Amsterdam this month.

The barrier system consists of two half-logs 22cm in diameter and either 2m or 4m long, reinforced at the back with a steel U-channel. The rails are mounted on an IPE 140 support with metal spacer. According to EN 1317 standard, the guardrail T40 offers a L2 double containment level N2 for passenger cars and H2 for heavy vehicles. To comply with Chinese regulations, the guardrail was tested with three vehicle types: a 10tonne bus launched at 60kph, a 10tonne truck, also launched at 60kph, and a 1.5tonne car at 100kph.

A first T40 crash barrier job was installed last December in Shandong province on the access road to Mount Tai Shan – a 1384 UNESCO World Heritage Site. These models of crash barriers are often used in scenic areas to reduce the visual impact of the barrier. Meanwhile, wood treatment ensures that the material offers a long service life to match that of the steel reinforcement.

Tertu said that the T40 system was tested in 2002 in France and has been successfully installed in other countries including Italy, Norway, Ireland, Czech Republic, the British Channel Island of Jersey, the Netherlands, Luxembourg, Belgium, Andorra, Israel, and of course France.

The current CE certified range offers 12 models, from containment level N1 to H2 covering working widths from W3 to W7.

The company has also partners or licensing arrangements in Chile, Brazil, New Zealand, Australia and South Korea. Half of the company’s turnover last year came from overseas contracts.

For more information on companies in this article

Related Content

  • Berghaus ProTec-Tor 120 successfully tested to DIN EN 1317, T3
    July 1, 2019
    German manufacturer Berghaus reports that its emergency opening ProTec-Tor 120 has successfully been tested according to the test criteria and requirements of DIN EN 1317. Test took place with a truck (TB 41) travelling at 70km/h and a car (TB 21) travelling at 80km/h. The ProTec-Tor 120 is a special element in our crash barrier system ProTec 100 (T3 / W2), according to the acceptance criteria of containment level T3. Up to now, in Germany such special elements were usually corroborated in static s
  • BarrierGuard’s successful New Zealand highway installation
    March 10, 2014
    Highway construction in the vast and varied Australasian landscape can be fraught with difficulties. Distance, extreme weather conditions and topographical challenges can all play a part in creating significant obstacles for design engineers. BarrierGuard 800, a state-of-the-art lightweight steel road safety barrier, is said to be proving invaluable in two ongoing projects setting new benchmarks for their respective regions. The US$895.7 million (AUS$1 billion) Gateway WA Perth Airport and Freight Acces
  • Norway considers speed limit hike to 120kph for some motorways
    June 21, 2019
    Raising the motorway speed limit in Norway to 120kph could mean four deaths annually, according to research by the Norwegian Public Roads Administration (Statens vegvesen). It could also cost up to €504 million to build or upgrade 460km of motorways to withstand the wear and tear caused by having a 120kph limit. State Secretary Tommy Skjervold said that the government will analyse the research before making a final decision about raising or not the speed limit on some motorways. Norway has some of
  • Norway drops planned fixed link between Moss and Horten
    October 25, 2018
    Norway’s Road Administration has stopped investigations into a proposed bridge or tunnel spanning 10.5km of the Oslofjord between Moss and Horten, according to Norwegian media. The Ministry of Transport has ordered Veivesendet to cancel consultations amid the government’s growing concern over the cost of any fixed link across the narrows, around 65km south of the capital Oslo. The half-hour car-ferry crossing as part of National Highway 19 will continue as usual. Several thousand people and vehicles m