Skip to main content

Sustainable bricks from KENOTEQ

UK firm KENOTEQ is offering a sustainable construction product in the shape of an unfired brick that is made from waste materials. Construction and demolition waste make up around 90% of the materials used in the firm’s novel K-Briq.
August 19, 2021 Read time: 1 min
A novel brick is now offered that is made from waste materials

The company is a clean-tech spin-out from Heriot-Watt University and is looking to commercialise production of its brick. The aim is to supply more than two million bricks/year.

The K-Briq is made from over 90% recycled demolition and construction waste materials. It has just 10% of the CO2 emissions of a traditional fired brick for its production and requires less than 10% of the energy in its manufacture.

The firm says that the production of this type of brick reduces the need to send waste materials from construction and demolition to landfill. In addition, production also slashes energy use, both in manufacturing and also in use as it has double the insulation properties of existing bricks and blocks. By using recycled pigments, it can be made in a range of colours providing flexibility to architects and design planners.

The K-Briq was conceived by Professor Gabriela Medero from Heriot-Watt University following more than a decade of research and development into creating innovative, low-carbon products from recycled construction waste. Professor Medero is co-founder and technical director of KENOTEQ, which launched in January 2020.

Related Content

  • Advanced asphalt plant innovations
    November 30, 2022
    Key advances are being seen in the asphalt plant market, with leading manufacturers developing new systems to produce materials more efficiently and with lower emissions, while using more recycled asphalt pavement (RAP) and also offering greater mobility
  • Terex in Red Diesel Replacement programme
    September 15, 2023
    The UK government has chosen six projects to move forward within the Red Diesel Replacement programme as a way to decarbonise construction, mining and quarrying.
  • 2020 vision for waste recycling
    February 22, 2013
    Brussels calls for 70% recycling of construction waste by 2020 but *Peter Craven asks if there is a greater target to be achieved in the UK. In the UK, over 90 million tonnes of construction, demolition and ground excavation (CD&E) waste is generated each year from construction, demolition and civil engineering projects. Across Europe this figure is well in excess of 1000 million tonnes and represents a valuable and sustainable asset to the construction sector, as well as protecting natural resources. The r
  • Graphene-enhanced pavements join UK Live Labs programme
    September 1, 2020
    While some parts of the world are on pause, road construction and new technology trials are still underway, as these stories demonstrate - Kristina Smith reports