Skip to main content

Stopping power: REBLOC’s 120AS_7.5 barrier

The highest containment level H4b offers the best possible protection by safely redirecting errant vehicles and preventing them from breaking through the barrier upon impact. The H4b barrier restrains the impact of a 38tonne truck driving at 65km/h (TB81, according to EN 1317-1/2).
January 13, 2021 Read time: 1 min

The highly versatile REBLOC 120 series can be installed for long-lasting H4b protection on the central reservation and along the verge. Additionally, the product is tested for installation on bridges.

The REBLOC 120AS_7.5 barrier with performance level H4b/W2 has already been installed on several motorways in large scale for the protection of critical bridge structures, such as bridge piers in the median.

The exceptionally low working width W2 means that the required space does not exceed 0.8m and reflects the very low dynamic deflection during impact. Valuable space can be maintained and sufficient width of traffic lanes is ensured. A key feature is the system height of 1.2m which offers effective glare protection.

REBLOC Concrete Barriers ensure a secure and fast installation at any time of the year, day or night, and, above all in any weather. The integrated, innovative coupling does not contain any loose parts. This not only enhances safety and speed of installation but also prevents unauthorised removal and vandalism. REBLOC safety barriers are fully tested to EN1317.

For more information on companies in this article

Related Content

  • PERI's tall order in Mexico
    February 14, 2012
    The Baluarte Bridge (Puente Baluarte), part of a major highway project, ranks among the most outstanding infrastructure projects ever constructed in Mexico.
  • It’s in with the new for asphalt plants
    April 4, 2013
    A leading asphalt plant manufacturer is playing a key role in the upgrade of a major European airport, while another is said to have created one of the most modern plants in Europe. Meanwhile, a host of new plants and plant concepts have been, or are about to be, unveiled. Guy Woodford reports Intrame says its ultra-mobile UM-280 asphalt plant has played a key role in the resurfacing of the runway and taxiways at Gatwick Airport in southern England – the busiest single runway airport in the world. Around 35
  • Asphalt paving advances for global markets
    October 27, 2022
    New asphalt paver designs for global markets are now being made available
  • Springtime for the use of analytics
    January 20, 2021
    Winter road maintenance can be made more efficient and effective through the use of big data and analytics, says Samu Karanko, head of science for Vaisala Digital in Europe.