Skip to main content

Stopping power: REBLOC’s 120AS_7.5 barrier

The highest containment level H4b offers the best possible protection by safely redirecting errant vehicles and preventing them from breaking through the barrier upon impact. The H4b barrier restrains the impact of a 38tonne truck driving at 65km/h (TB81, according to EN 1317-1/2).
January 13, 2021 Read time: 1 min

The highly versatile REBLOC 120 series can be installed for long-lasting H4b protection on the central reservation and along the verge. Additionally, the product is tested for installation on bridges.

The REBLOC 120AS_7.5 barrier with performance level H4b/W2 has already been installed on several motorways in large scale for the protection of critical bridge structures, such as bridge piers in the median.

The exceptionally low working width W2 means that the required space does not exceed 0.8m and reflects the very low dynamic deflection during impact. Valuable space can be maintained and sufficient width of traffic lanes is ensured. A key feature is the system height of 1.2m which offers effective glare protection.

REBLOC Concrete Barriers ensure a secure and fast installation at any time of the year, day or night, and, above all in any weather. The integrated, innovative coupling does not contain any loose parts. This not only enhances safety and speed of installation but also prevents unauthorised removal and vandalism. REBLOC safety barriers are fully tested to EN1317.

For more information on companies in this article

Related Content

  • Asphalt paving innovations are coming
    July 28, 2023
    Innovative new machines are coming to market that will boost efficiency for the asphalt paving segment
  • Forming iconic structures
    July 18, 2012
    Specially designed and constructed formwork is being used to create some iconic bridges worldwide The Golden Ears Bridge over the Fraser River will unite the municipalities of Richmond, New Westminister and Delta in the scenic British Columbia province of Canada. The bridge, part of a CAD$800 million (US$670 million) project, is an 'extra dosed' cable stayed bridge, which means the deck will be supported by both cables and the structure itself. This design reduces the overall height of the two towers as req
  • Fuel alternatives for the future
    July 25, 2022
    Engine firms are working to ensure engines can run on alternative fuel types
  • DynaGate swings into action
    October 30, 2024
    DynaGate offers a new solution to boost road safety.