Stopping power: REBLOC’s 120AS_7.5 barrier

The highest containment level H4b offers the best possible protection by safely redirecting errant vehicles and preventing them from breaking through the barrier upon impact. The H4b barrier restrains the impact of a 38tonne truck driving at 65km/h (TB81, according to EN 1317-1/2).
January 13, 2021 Read time: 1 min

The highly versatile REBLOC 120 series can be installed for long-lasting H4b protection on the central reservation and along the verge. Additionally, the product is tested for installation on bridges.

The REBLOC 120AS_7.5 barrier with performance level H4b/W2 has already been installed on several motorways in large scale for the protection of critical bridge structures, such as bridge piers in the median.

The exceptionally low working width W2 means that the required space does not exceed 0.8m and reflects the very low dynamic deflection during impact. Valuable space can be maintained and sufficient width of traffic lanes is ensured. A key feature is the system height of 1.2m which offers effective glare protection.

REBLOC Concrete Barriers ensure a secure and fast installation at any time of the year, day or night, and, above all in any weather. The integrated, innovative coupling does not contain any loose parts. This not only enhances safety and speed of installation but also prevents unauthorised removal and vandalism. REBLOC safety barriers are fully tested to EN1317.

For more information on companies in this article

Related Content

  • Asphalt compaction finishing
    February 16, 2021
    Volvo CE is now offering a new rubber tyred compactor for finishing work in key emergent markets
  • PERI fills gap in Greek market
    February 19, 2013
    A team of Greek and German PERI engineers have developed a comprehensive formwork and scaffolding solution for the T4 bridge on the A7 motorway in Greece. The 160km long A7 connects Kalamata in the south to Corinth in the northwest of the Peloponnese peninsula. On one stretch of the motorway a 390m long arched bridge – known as T4 – is being used to close the gap between Paradisia and Tsakona. Set for completion in early 2014, two-thirds of the 22m wide bridge superstructure will be suspended on a steel arc
  • Doka rises to the challenge on Turkey’s Eyiste Viaduct
    June 4, 2019
    Formwork specialist Doka recently rose to the challenge on Turkey’s Eyiste Viadust, the country’s highest bridge with piers up to 155m tall. The Eyiste Viaduct will be part of a route between Central Anatolia and Turkey’s Mediterranean region, shortening travel time between the cities of Konya and Alanya. Cantilever forming travellers and Doka’s automatic climbing formwork Xclimb 60 were part of the construction solution. The viaduct is nearly 1.4km long and carried by two abutments and eight piers, stret
  • Volvo’s 75tonne EC750E optimises productivity and profitability
    March 14, 2016
    Fuel efficiency, increased productivity and better performance ensure the EC750E crawler excavator from Volvo Construction Equipment delivers maximum return on investment. The 75-tonne EC750E offers power and stability to deliver high capacity in most applications. Powered by Volvo’s Tier 4 Final/Stage IV compliant D16 engine, the heavy-duty excavator delivers increased horsepower of 374 kW/502 hp. The EC750E offers an electro-hydraulic system, optimised to operate in harmony with the robust engine, d