Skip to main content

Stimsonite Click Stud saves on in-situ replacement time

Over the past four years, there have been nine road worker deaths on the Highways Agency network in the UK. Statistics such as these are drivers for road authorities to improve health and safety for the workforce on the network. It takes just seconds to replace a Stimsonite Click Stud reflector compared to an average time of eight minutes to remove and replace a conventional bonded road stud. This greatly benefits the Highways Agency by reducing the exposure of road workers to traffic. Conventional
April 29, 2015 Read time: 2 mins
Over the past four years, there have been nine road worker deaths on the 2309 Highways Agency network in the UK. Statistics such as these are drivers for road authorities to improve health and safety for the workforce on the network.

It takes just seconds to replace a Stimsonite Click Stud reflector compared to an average time of eight minutes to remove and replace a conventional bonded road stud. This greatly benefits the Highways Agency by reducing the exposure of road workers to traffic.

Conventional reflective road studs are typically assembled using adhesive to fix the reflector in the housing. The bonded assembly provides good durability and working life for the reflector. However, when the reflector needs to be replaced, the bonding method of assembly makes the replacement process time consuming and expensive. Removing the old reflector, cleaning the recess and refitting with adhesive is laborious and time-consuming. Extended road closures are required causing unnecessary disruption and risk to the work force.

The novel Stimsonite Click Stud has a patented fixing system that allows rapid removal and replacement of the reflector in-situ in the road surface. Due to the reduced traffic management costs as well as the fast, cost-effective reflector replacement, the Stimsonite Click Stud has a lower whole life cost compared to any other product currently on the market.

At times of surface dressing the reflector can be removed and clicked back in place once the work is completed. Labour and traffic management costs are estimated to be two thirds of that of conventional units, while traffic disruption is reduced and lane closures will be shortened. The reflector can also be removed and replaced with blanks during roadworks when there are lane movements or priority change, to help avoid road user confusion with lane delineation. Once the works are complete the process can be quickly reversed, saving time and money and these units are already being used in the UK on the M25, A14 and M74.

For more information on companies in this article

Related Content

  • Importance of road/tunnel drainage systems
    May 8, 2012
    A variety of systems are available for quickly and efficiently removing water from roads as Patrick Smith reports. The presence of water in a highway layer reduces the bearing capacity of the road, and in doing so it also reduces the structure's lifetime. Indeed, the recent extremely cold winter in many parts of Europe has shown that in colder climates there is a risk of frost damage when water is present resulting in costly potholes, so drainage systems performing properly are important in road design.
  • Lindsay argues the case for reversible lanes over adding lanes
    June 26, 2018
    Build new lanes or use existing lanes more effectively? In a recent US study* commissioned by Lindsay Transportation Solutions, the company argues the case for reversible lanes. The level of future uncertainty in transportation planning - specifically in addressing congestion on urban freeways - has increased significantly over the past few years. The impact of connected and autonomous vehicles on traffic flow, of Mobility as a Service (MaaS) initiatives, particularly the car-sharing elements, and exciting
  • The A14 Cambridge to Huntingdon improvement scheme takes shape
    May 31, 2017
    Highways England’s project manager gives sneak peek into progress on the UK’s biggest road upgrade now under construction. Road construction workers often find interesting buried items when building roads and the UK’s A14 Cambridge to Huntingdon improvement scheme is proving the point. It’s been less than half a year since construction started on the €1.76 billion A14 scheme, Highways England’s largest ongoing project. Highways England is the wholly government-owned company responsible for modernising, main
  • Specialist asphalt supply for road upgrade
    November 10, 2021
    A major road in Norfolk has been improved following the installation of Tarmac’s largest ever supply of a specialist asphalt solution. This material grade has been designed to maintain roads where the underlying concrete has deteriorated