Skip to main content

Stimsonite Click Stud saves on in-situ replacement time

Over the past four years, there have been nine road worker deaths on the Highways Agency network in the UK. Statistics such as these are drivers for road authorities to improve health and safety for the workforce on the network. It takes just seconds to replace a Stimsonite Click Stud reflector compared to an average time of eight minutes to remove and replace a conventional bonded road stud. This greatly benefits the Highways Agency by reducing the exposure of road workers to traffic. Conventional
April 29, 2015 Read time: 2 mins
Over the past four years, there have been nine road worker deaths on the 2309 Highways Agency network in the UK. Statistics such as these are drivers for road authorities to improve health and safety for the workforce on the network.

It takes just seconds to replace a Stimsonite Click Stud reflector compared to an average time of eight minutes to remove and replace a conventional bonded road stud. This greatly benefits the Highways Agency by reducing the exposure of road workers to traffic.

Conventional reflective road studs are typically assembled using adhesive to fix the reflector in the housing. The bonded assembly provides good durability and working life for the reflector. However, when the reflector needs to be replaced, the bonding method of assembly makes the replacement process time consuming and expensive. Removing the old reflector, cleaning the recess and refitting with adhesive is laborious and time-consuming. Extended road closures are required causing unnecessary disruption and risk to the work force.

The novel Stimsonite Click Stud has a patented fixing system that allows rapid removal and replacement of the reflector in-situ in the road surface. Due to the reduced traffic management costs as well as the fast, cost-effective reflector replacement, the Stimsonite Click Stud has a lower whole life cost compared to any other product currently on the market.

At times of surface dressing the reflector can be removed and clicked back in place once the work is completed. Labour and traffic management costs are estimated to be two thirds of that of conventional units, while traffic disruption is reduced and lane closures will be shortened. The reflector can also be removed and replaced with blanks during roadworks when there are lane movements or priority change, to help avoid road user confusion with lane delineation. Once the works are complete the process can be quickly reversed, saving time and money and these units are already being used in the UK on the M25, A14 and M74.

For more information on companies in this article

Related Content

  • Responsive roadsign developed by student
    August 22, 2013
    A UK student hopes his new lenticular road signs which ‘pulse’ at drivers will lead to a revolution in the way motorists are given information on the roads. Meanwhile, a leading road marking firm is helping keep tourists safe in a spiritually significant town in Umbria, Italy. Guy Woodford reports You may think Charles Gale’s vision of creating the first ‘pulsing’ lenticular road sign was the result of months, even years, spent studying traffic and driver behaviour on the roads of his adopted student c
  • Brazilian contractor uses novel methods for high quality road
    January 5, 2015
    Cold-in place recycling method provides fast road rebuild in Brazil In Brazil a road contractor has carried out a high quality road rebuilding job, using novel techniques. Contractor Brown Brown is located in Santa Teresinha in the state of Bahia and recently carried out a two-week job for the company to rehabilitate sections of highway BR-381. The highway is an important route in Brazil and runs from Sao Paulo to Belo Horizonte. Highway BR-381 or Rodovia Fernão Dias, as it is called, stretches some 576km
  • Crack infill system ideal reinstatement solution
    February 17, 2012
    Overnight repair work on a major English motorway has avoided the major traffic disruption and significantly increased road surfacing costs that would have occurred if left untreated.
  • New guidelines to improve highway emergency response
    July 6, 2012
    New guidelines have been introduced to improve how the Highways Agency (HA) and emergency services work together. Under the guidelines, part of a Government strategy to reduce the US$1.5billion (£1bn) cost of motorway incidents, the police, fire and ambulance services and the HA have signed up to the CLEAR booklet - drawn up by Agency to tackle congestion caused by lane closures. Launched last year by Roads Minister Mike Penning, The CLEAR (Collision, Lead, Evaluate, Act, Reopen) initiative aims to get tra