Skip to main content

Stable ground with geogrids

New geogrid products are claimed to reduce the quantity of earthworks required for some construction jobs by over 40%.
March 25, 2021 Read time: 1 min
New geogrid products can cut earthworks needs

Where embankments have to be reinforced, subsoils stabilised, or sinkholes bridged, the need for soil reinforcement can be high due to extreme weather events.

However, NAUE claims that its Secugrid HS geogrids enable time savings for complex earthworks. With weak and compressible soils, earthworks can be tricky and time consuming. The fill has to be installed in stages, and the soft soil may need to be relieved by a deep foundation. These measures usually take a lot of time and increase costs. But the Secugrid HS geogrids can simplify and reduce earthworks.

High tensile strengths of the geogrids of up to 1200kN/m increase the long-term stability of embankments. The geogrids relieve the soft soil and stabilise the embankment structure. Differential settlements are mitigated, and larger fill heights reduce the construction time.

Secugrid HS was developed specifically for geotechnical applications in earthworks where tensile strengths of more than 400kN/m are required. The laid geogrids are made of high tenacity polyester filaments with an extruded polyethylene protective coating and welded junctions. They combine high tensile strengths and low creep tendency with extreme robustness and resistance even under permanent loads.

For more information on companies in this article

Related Content

  • Concrete testing - defining standards
    February 13, 2012
    Concrete is a versatile construction product, but it must be tested to make sure that it is fit for purpose
  • Bomag is on track – London to Glasgow in 2 hours and 40 minutes
    July 1, 2022
    British Railways has big plans. Trains on the first 220 km from London Euston Station to Birmingham could be travelling at a speed of 360 km/h (225 mph) in as little as 10 years. The earthworks required for this are to be completed by as early as 2025. The project is considered one of the largest and most ambitious infrastructure projects in recent British history. It must meet the highest possible construction quality standards and evolve over the course of the project - setting new standards today and for tomorrow. The deployment of innovative BOMAG technologies and machines is therefore logical and consistent.
  • Bomag launches tractor-towed stabiliser range
    January 19, 2022
    Both models have a working width of 2.5m while the RS 250 version has a milling depth of up to 40cm and the RS 300 version has a depth of 50cm.
  • A flexible approach to concrete testing
    February 20, 2012
    One of the world's most versatile building materials is subject to a variety of tests to make sure it is fit for purpose. Patrick Smith reports