Skip to main content

Stable ground with geogrids

New geogrid products are claimed to reduce the quantity of earthworks required for some construction jobs by over 40%.
March 25, 2021 Read time: 1 min
New geogrid products can cut earthworks needs

Where embankments have to be reinforced, subsoils stabilised, or sinkholes bridged, the need for soil reinforcement can be high due to extreme weather events.

However, NAUE claims that its Secugrid HS geogrids enable time savings for complex earthworks. With weak and compressible soils, earthworks can be tricky and time consuming. The fill has to be installed in stages, and the soft soil may need to be relieved by a deep foundation. These measures usually take a lot of time and increase costs. But the Secugrid HS geogrids can simplify and reduce earthworks.

High tensile strengths of the geogrids of up to 1200kN/m increase the long-term stability of embankments. The geogrids relieve the soft soil and stabilise the embankment structure. Differential settlements are mitigated, and larger fill heights reduce the construction time.

Secugrid HS was developed specifically for geotechnical applications in earthworks where tensile strengths of more than 400kN/m are required. The laid geogrids are made of high tenacity polyester filaments with an extruded polyethylene protective coating and welded junctions. They combine high tensile strengths and low creep tendency with extreme robustness and resistance even under permanent loads.

For more information on companies in this article

Related Content

  • Innovative reinforcement for weak roads
    May 9, 2012
    An innovative solution was put forward to support slip roads on a Dutch motorway. Patrick Smith reports. The 2010 opening of the A7 motorway extension on the southern ring road of the city of Sneek, The Netherlands, brings an end to local traffic misery. By using innovative Tensar Geocell Foundation Mattress technology over weak estuarine clay, MNO-Vervat Noord, the main contractor, constructed a key junction and its slip roads in weeks instead of months, with considerable cost savings.
  • Innovative reinforcement for weak roads
    April 10, 2012
    An innovative solution was put forward to support slip roads on a Dutch motorway. Patrick Smith reports The 2010 opening of the A7 motorway extension on the southern ring road of the city of Sneek, The Netherlands, brings an end to local traffic misery. By using innovative Tensar Geocell Foundation Mattress technology over weak estuarine clay, MNO-Vervat Noord, the main contractor, constructed a key junction and its slip roads in weeks instead of months, with considerable cost savings. The conversion
  • 'Soft' option gets results
    February 8, 2012
    Soft engineering techniques, used to prevent soil erosion and stabilise steep cuts and embankments, have allowed engineers to successfully widen the M1 motorway in the UK. Over the 50km length of the work (25km northbound, 25km southbound) on a busy section of the motorway near the city of Nottingham, a total of 48km of slopes had to be modified, split roughly between cutting and embankment. The UK Highways Agency requirements for the work meant that wholesale widening of the corridor was not possible: the
  • Solid ground
    June 1, 2022
    The depth effect of heavy single drum rollers is remarkable and is significantly increased by the polygonal drum, available only from BOMAG.