Skip to main content

Stable ground with geogrids

New geogrid products are claimed to reduce the quantity of earthworks required for some construction jobs by over 40%.
March 25, 2021 Read time: 1 min
New geogrid products can cut earthworks needs

Where embankments have to be reinforced, subsoils stabilised, or sinkholes bridged, the need for soil reinforcement can be high due to extreme weather events.

However, NAUE claims that its Secugrid HS geogrids enable time savings for complex earthworks. With weak and compressible soils, earthworks can be tricky and time consuming. The fill has to be installed in stages, and the soft soil may need to be relieved by a deep foundation. These measures usually take a lot of time and increase costs. But the Secugrid HS geogrids can simplify and reduce earthworks.

High tensile strengths of the geogrids of up to 1200kN/m increase the long-term stability of embankments. The geogrids relieve the soft soil and stabilise the embankment structure. Differential settlements are mitigated, and larger fill heights reduce the construction time.

Secugrid HS was developed specifically for geotechnical applications in earthworks where tensile strengths of more than 400kN/m are required. The laid geogrids are made of high tenacity polyester filaments with an extruded polyethylene protective coating and welded junctions. They combine high tensile strengths and low creep tendency with extreme robustness and resistance even under permanent loads.

For more information on companies in this article

Related Content

  • The Preston Western Distributor
    September 7, 2023
    Costain, as main contractor for the Preston Western Distributor project, was involved from the earliest stages, thanks to the UK’s Early Contractor Involvement approach. The project was delivered on time and on budget to the benefit of the local environment, local businesses and the region’s workforce. David Arminas reports*
  • Volvo’s 75tonne EC750E optimises productivity and profitability
    March 14, 2016
    Fuel efficiency, increased productivity and better performance ensure the EC750E crawler excavator from Volvo Construction Equipment delivers maximum return on investment. The 75-tonne EC750E offers power and stability to deliver high capacity in most applications. Powered by Volvo’s Tier 4 Final/Stage IV compliant D16 engine, the heavy-duty excavator delivers increased horsepower of 374 kW/502 hp. The EC750E offers an electro-hydraulic system, optimised to operate in harmony with the robust engine, d
  • Volvo’s 75tonne EC750E optimises productivity and profitability
    January 6, 2017
    Fuel efficiency, increased productivity and better performance ensure the EC750E crawler excavator from Volvo Construction Equipment delivers maximum return on investment. The 75-tonne EC750E offers power and stability to deliver high capacity in most applications. Powered by Volvo’s Tier 4 Final/Stage IV compliant D16 engine, the heavy-duty excavator delivers increased horsepower of 374 kW/502 hp. The EC750E offers an electro-hydraulic system, optimised to operate in harmony with the robust engine, d
  • Bridge and tunnel concrete testing vital for longevity
    July 9, 2012
    Modern technology is making testing more efficient and reliable, increasing productivity and reducing costs, as Patrick Smith reports A few years ago, visual inspection of an 18-year-old bridge by ARRB in Australia identified considerable cracking in the precast, prestressed deck planks as well as in the cast in situ deck overlay. Laboratory examination indicated that the deck planks and the deck overlay were suffering from a strong case of alkali-aggregate reaction (AAR). Testing of concrete cores drilled