Skip to main content

Solar security with SOSEC barriers from Green Gate Access Systems

SOSEC, a mobile solar-powered barrier system for work sites, made its UK debut on the M23 motorway. The SOSEC gate – solar and security – is made by Green Gate Access Systems, a subsidiary of Solar Gates UK, which provides and installs solar and mains-powered gates, barriers and access control systems. The system on the M23 provided contractors with a power-free method to slow and control access to the work zone, track who is on site and prevent accidental entry from the public.
December 7, 2017 Read time: 2 mins
SOSEC barriers can operate up to 900 times a day
SOSEC, a mobile solar-powered barrier system for work sites, made its UK debut on the M23 motorway.


The SOSEC gate – solar and security – is made by Green Gate Access Systems, a subsidiary of Solar Gates UK, which provides and installs solar and mains-powered gates, barriers and access control systems. The system on the M23 provided contractors with a power-free method to slow and control access to the work zone, track who is on site and prevent accidental entry from the public.

Highways Care, a contractor responsible for installing overnight 1.5km of temporary crash barrier on the live lane, used the SOSEC system to secure the entire route. A 4G intercom allows visiting contractors or emergency services to contact the central control office with known contractors using managed swipe cards or entry codes – all powered by the sun.

SOSEC combines a 5m automatic traffic barrier with optional full-length drop skirt and LED lights to control vehicles with a rugged, locked and self-closing gate for pedestrians. It is designed around a rugged, galvanised, 8mm steel platform with a compact footprint allowing it to be positioned with a forklift or telehandler.

A high-capacity solar panel operates the barrier up to 900 times per day, even during an average British winter. For short-term sites, SOSEC comes with a battery store for use up to one month.

The combined barrier and gate allows access control to be customised to site needs. Supplied with simple key code and radio remotes as standard, additional options include 700m remotes, mobile phone opener, swipe cards, key codes, open/close timer or simple entry/exit on approach. Each unit arrives fully tested to BS EN13241-1, force tested to BS EN 12445 and complies with the gate safety standards as defined in DHF TS011.

Related Content

  • Engine improvements for decarbonisation
    June 5, 2024
    As the need for decarbonisation becomes more pressing, engine firms are looking ahead to the next step for power systems, writes Mike Woof.
  • Vacuworx offers the HL Series Hydraulic Barrier Lifters
    May 22, 2018
    Highway construction projects can be particularly challenging when space is limited, roads are crowded and time is short. To meet these challenges, the US company Vacuworx has developed the HL Series Hydraulic Barrier Lifters. Vacuworx describes the lifters as “a smarter way to handle concrete barriers”. The traditional method of moving concrete road barriers with slings and chains is slow and lacks control, not to mention increasing the dangers of accidents for employees. Designed for use with a variety
  • Geosynthetic drainage technology developments
    June 13, 2012
    An innovative solution to providing vital, low-impact surface water control for one of Britain’s largest local authority road schemes is said to have been recently achieved using Hydro International’s (HI) Hydro Vortex Drop Shaft  ow control technology. The new 7km bypass built by Costain at Church Village, near Pontypridd, South Wales, required careful planning to minimise its effect on the countryside and the local environment. Rhondda Cynon Taff Council needed to bypass Church Village to reduce traf c
  • MAT Mischanlagentechnik debuts BE-2550 technology in Switzerland
    April 12, 2018
    The Bauer subsidiary MAT Mischanlagentechnik, known for microtunneling technology, has entered the large-diameter tunnelling market with its BE-2550 separating plant in Switzerland. The double-track Eppenberg tunnel in the Swiss canton of Solothurn is about 2.6 km long and is one of the busiest railway routes in Switzerland. Since November 2016, a 2,400tonne tunnel boring machine measuring around 115m long and 12.75m in diameter has been drilling through the mountain. The machine has been operating in the