Skip to main content

Safer with REBLOC 185A barriers

The concrete 185A is an extensively tested and fully EN 1317-1/2 compliant safety barrier with highest containment levels H4a and H4b.
By David Arminas February 15, 2022 Read time: 2 mins
The anchored REBLOC 185A precast concrete barrier offers the best protection against errant vehicles

REBLOC says that its 185A barrier is the world’s first safety barrier to have the highest containment levels of H4a and H4b with the unmatched vehicle intrusion rating of VI2.

The impact of heavy goods vehicles with bridges – be it piers, overhead signs, suspension cables or other street furniture – continues to be a major issue for highway owners and local authorities. There is always the chance that damage to a bridge’s structure could at any time render it unsafe for further use until repairs are made.

Now, with the precast concrete safety barrier 185A from REBLOC, comes the world´s first extensively tested and fully EN 1317-1/2 compliant safety barrier with highest containment levels H4a and H4b. It has a working width of W1 and W2 and has an outstanding VI2 vehicle intrusion level. All this from a barrier that is 1.85m high, only 0.57m wide and needing a footprint of just 0.8m, making the system suitable for a vast array of bridge types.

The anchored barrier offers the best protection against errant vehicles, prevents the vehicle from breaking through or projecting over the barrier. Damage to the bride structure is limited and – importantly – driver and passenger safety is greatly enhanced.

Due to its modular design and a patented coupling system, the REBLOC 185A is quickly and effortlessly installed on site irrespective of the season or weather conditions. Fast and efficient installation shortens the time of restrictive measures for traffic.

REBLOC is a specialist in precast concrete barriers, providing a wide range of road safety solutions for almost every permanent and temporary application on roads and bridges, including integrated noise protection, emergency gates and urban safety systems.

For more information on companies in this article

Related Content

  • Montreal’s new Champlain Bridge is shaping up for Christmas
    September 10, 2018
    Montreal’s Champlain Bridges - one going up, one coming down, reports David Arminas The importance of the new Champlain Bridge to Montreal and Canada can’t be overstated, given the crumbling nature of the not-so-old original Champlain Bridge. The original steel truss affair across the St Lawrence River and the adjacent St Lawrence Seaway canal is “a lifeline for residents and businesses” in greater Montréal, according to the national Auditor General - the public sector spending watchdog. “It accommodates
  • Formwork solutions for bridge maintenance and repair
    January 6, 2015
    An array of innovative formwork solutions have helped in the repair and construction of key bridge links - Mike Woof writes Formwork producers are continually developing novel solutions for bridge maintenance and construction applications. Several key structures have benefited from the novel use of formwork systems, with suppliers such as Doka, PERI, Pilosio and RMD all working on important structures in recent times. In Estonia, construction work is underway on the bypass around Tartu, the country’s
  • Zipping up road lanes
    September 28, 2018
    QMB has a Lindsay Road Zipper on duty near Montreal. World Highways deputy editor David Arminas climbed aboard As vice president of Canadian barrier specialist QMB, based in Laval, Quebec, Marc-Andre Seguin is sanguine about the future for moveable barriers. On the one hand, it looks good. The oft-stated advantage of moveable barriers is that the systems are cheaper to install than adding a lane or two to a highway or bridge. Directional changes to lanes can boost volume on a road without disrupting tra
  • Fast bridge building in Tennessee
    July 5, 2016
    The Tennessee Department of Transportation (TDOT) recently completed the Fast Fix 8 bridge project in Nashville, with help from a Power Curbers slipformer belonging to Irwin Concrete Construction. TDOT’s goal was to replace eight ageing interstate bridges along Interstate 40 through Nashville using a process called Accelerated Bridge Construction (ABC). This uses fast-paced, around-the-clock work to limit road closures and speed up bridge completion, impacting surrounding communities as little as possibl